© The Institution of Electrical Engineers
The use of an analogue computer for short-term optimum hydroelectric-power-generation scheduling is presented. The optimum objective is to minimise the instantaneous energy taken from the system reservoirs, subject to satisfying a predetermined load demand. All downstream stations on a river system are treated as run-of-the-river types. Flowtime delays between stations are neglected in the optimising process, and nonconforming loads are treated as negative generators.
References
-
-
1)
-
G.A. Korn
.
Stabilization of simultaneous equation solvers.
Proc. Inst. Radio Engrs.
,
1000 -
1002
-
2)
-
L.L. Garver
.
Power generation scheduling by integer programming—development of theory.
IEEE Trans.
,
730 -
735
-
3)
-
Chandler, W.M., Gabrielle, A.F.: `Economy loading of hydroelectric systems', 1950, M.Sc. thesis, Massachusetts Institute of Tehnology.
-
4)
-
J.B. Ward ,
H.W. Hale
.
Discussion contribution.
Trans. Amer. Inst. Elect. Engrs.
,
517 -
518
-
5)
-
E.D. Early ,
R.E. Watson ,
G.L. Smith
.
A general transmission loss equation.
Trans. Amer. Inst. Elect. Engrs.
,
510 -
516
-
6)
-
C.E. Berry ,
D.E. Wilcox ,
S.M. Rock ,
H.W. Washburn
.
A computer for solving linear simultaneous equations.
J. Appl. Phys.
,
262 -
272
http://iet.metastore.ingenta.com/content/journals/10.1049/piee.1971.0014
Related content
content/journals/10.1049/piee.1971.0014
pub_keyword,iet_inspecKeyword,pub_concept
6