Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

access icon openaccess Simplification and evaluation of demand response by the use of statistical aggregated models

Loading full text...

Full text loading...

/deliver/fulltext/oap-cired/2017/1/OAP-CIRED.2017.1117.html;jsessionid=8ba76f96alokc.x-iet-live-01?itemId=%2fcontent%2fjournals%2f10.1049%2foap-cired.2017.1117&mimeType=html&fmt=ahah

References

    1. 1)
      • 1. Western wind and solar integration’, GE Energy', prepared for NREL (USA), Report 550-47434, 2010.
    2. 2)
    3. 3)
      • 10. OpenADR official web site. Available at http://www.openadr.org/ (accessed 14 January 2017).
    4. 4)
    5. 5)
      • 3. BRCM toolbox, ETH de Zurich. Available at http://www.brcm.ethz.ch/doku.php.
    6. 6)
    7. 7)
      • 14. Seijo, M., López, G., Moreno, J.I., et al: ‘On-line evaluation and planning tool for medium voltage-broadband over power line cells’. Proc. IEEE Int. Energy Conf. (ENERGYCON), Leuven, Belgium, 2016.
    8. 8)
      • 5. EU Deep Project. VI Framework research program, Available at http://www.eu-deep.com (accessed 15 July 2016).
    9. 9)
    10. 10)
    11. 11)
      • 6. Matanza, J., Kilicotte, S., Alexandres, S., et al: ‘The theory of stochastic processes’ (Ed. Chapman and Hall, 1997).
    12. 12)
    13. 13)
      • 2. PJM system: markets and operation results. Available at http://www.pjm.com/markets-and-operations/.
    14. 14)
      • 15. SimMVBPL official site. Available at http://panal.it.uc3m.es/osiris-project/simmvbpl-mv-bpl-cell-simulator/ (accessed 14 January 2016).
    15. 15)
      • 8. Kellow, B., Freeman. Sullivan & Co.: ‘2009 pacific gas and electric company SmartAC AS pilot’. Report, 2009.
http://iet.metastore.ingenta.com/content/journals/10.1049/oap-cired.2017.1117
Loading

Related content

content/journals/10.1049/oap-cired.2017.1117
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address