Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

access icon openaccess Online control algorithm for sub-half-hourly operation of LV connected energy storage device owned by DNO

Loading full text...

Full text loading...

/deliver/fulltext/oap-cired/2017/1/OAP-CIRED.2017.0481.html;jsessionid=55f8iksuspdjp.x-iet-live-01?itemId=%2fcontent%2fjournals%2f10.1049%2foap-cired.2017.0481&mimeType=html&fmt=ahah

References

    1. 1)
      • 2. Scottish and Southern Energy Power Distribution: ‘Discussion document: energy storage and power electronics on the low voltage distribution network (SDRC 9.4a)’, 2011. Retrieved from http://www.thamesvalleyvision.co.uk/projectlibrary/published-documents/sdrc/manage/.
    2. 2)
      • 1. Evans, G.: ‘New Thames valley vision technical impact evaluation impact on DNO network from low carbon promotions’, SDRC 9.8b (SSET203), 2016.
    3. 3)
    4. 4)
    5. 5)
http://iet.metastore.ingenta.com/content/journals/10.1049/oap-cired.2017.0481
Loading

Related content

content/journals/10.1049/oap-cired.2017.0481
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address