http://iet.metastore.ingenta.com
1887

access icon openaccess Estimating lower probability bound of power system's capability to fully accommodate variable wind generation

  • PDF
    1.1943349838256836MB
  • XML
    146.0263671875Kb
  • HTML
    211.5791015625Kb
Loading full text...

Full text loading...

/deliver/fulltext/10.1049/joe.2018.8603/JOE.2018.8603.html;jsessionid=77j8dhk7o65pl.x-iet-live-01?itemId=%2fcontent%2fjournals%2f10.1049%2fjoe.2018.8603&mimeType=html&fmt=ahah

References

    1. 1)
      • 1. Handschin, E., Petroianu, A.: ‘Energy management systems: operation and control of electric energy transmission systems’ (Springer Press, Berlin, 1991).
    2. 2)
      • 2. Morales, J.M., Conejo, A.J., Madsen, H., et al: ‘Integrating renewables in electricity markets: operational problems’ (Springer, Berlin, 2014).
    3. 3)
      • 3. Wu, L., Shahidehpour, M., Li, Z.: ‘Comparison of scenario-based and interval optimization approaches to stochastic SCUC’, IEEE Trans. Power Syst., 2012, 27, (2), pp. 913921.
    4. 4)
      • 4. Restrepo, J.F., Galiana, F.D.: ‘Assessing the yearly impact of wind power through a new hybrid deterministic/stochastic unit commitment’, IEEE Trans. Power Syst., 2011, 26, (1), pp. 401410.
    5. 5)
      • 5. Ummels, B.C., Gibescu, M., Pelgrum, E., et al: ‘Impacts of wind power on thermal generation unit commitment and dispatch’, IEEE Trans. Energy Convers., 2007, 22, (1), pp. 4451.
    6. 6)
      • 6. Daneshi, H., Srivastava, A.K.: ‘Security-constrained unit commitment with wind generation and compressed air energy storage’, IET Gener. Transm. Distrib., 2012, 6, (2), pp. 167175.
    7. 7)
      • 7. Jabr, R.A., Karaki, S., Korbane, J.A.: ‘Robust multi-period OPF With storage and renewables’, IEEE Trans. Power Syst., 2014, 5, (30), pp. 27902799.
    8. 8)
      • 8. Opathella, C., Venkatesh, B.: ‘Managing uncertainty of wind energy With wind generators cooperative’, IEEE Trans. Power Syst., 2013, 28, (3), pp. 29182928.
    9. 9)
      • 9. Wang, J., Shahidehpour, M., Li, Z.: ‘Security-constrained unit commitment with volatile wind power generation’, IEEE Trans. Power Syst., 2008, 23, (3), pp. 13191327.
    10. 10)
      • 10. Pappala, V.S., Erlich, I., Rohrig, K., et al: ‘A stochastic model for the optimal operation of a wind-thermal power system’, IEEE Trans. Power Syst., 2009, 24, (2), pp. 940950.
    11. 11)
      • 11. Jiang, R., Wang, J., Guan, Y.: ‘Robust unit commitment with wind power and pumped storage hydro’, IEEE Trans. Power Syst., 2012, 27, (2), pp. 800810.
    12. 12)
      • 12. Guan, Y., Wang, J.: ‘Uncertainty sets for robust unit commitment’, IEEE Trans. Power Syst., 2014, 29, (3), pp. 14391440.
    13. 13)
      • 13. Wei, W., Liu, F., Mei, S., et al: ‘Robust energy and reserve dispatch under variable renewable generation’, IEEE Trans. Smart Grid, 2014, 6, (1), pp. 369380.
    14. 14)
      • 14. Wu, L., Shahidehpour, M., Li, T.: ‘Stochastic security-constrained unit commitment’, IEEE Trans. Power Syst., 2007, 22, (2), pp. 800811.
    15. 15)
      • 15. Constantinescu, E.M., Zavala, V.M., Rocklin, M., et al: ‘A computational framework for uncertainty quantification and stochastic optimization in unit commitment with wind power generation’, IEEE Trans. Power Syst., 2011, 26, (1), pp. 431441.
    16. 16)
      • 16. Wang, Q., Guan, Y., Wang, J.: ‘A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output’, IEEE Trans. Power Syst., 2012, 27, (1), pp. 206215.
    17. 17)
      • 17. Zheng, Q.P., Wang, J., Liu, A.L.: ‘Stochastic optimization for unit commitment: A review’, IEEE Trans. Power Syst., 2014, 30, (4), pp. 14391440.
    18. 18)
      • 18. Bertsimas, D., Litvinov, E., Sun, X.A., et al: ‘Adaptive robust optimization for the security constrained unit commitment problem’, IEEE Trans. Power Syst., 2013, 28, (1), pp. 5263.
    19. 19)
      • 19. Wang, Y., Xia, Q., Kang, C.: ‘Unit commitment with volatile node injections by using interval optimization’, IEEE Trans. Power Syst., 2011, 26, (3), pp. 17051713.
    20. 20)
      • 20. Jiang, R., Wang, J., Zhang, M., et al: ‘Two-stage minimax regret robust unit commitment’, IEEE Trans. Power Syst., 2013, 28, (3), pp. 22712282.
    21. 21)
      • 21. Martin-Martinez, S., Gomez-Lazaro, E., Molina-Garcia, A., et al: ‘Impact of wind power curtailments on the spanish power system operation’. Proc. IEEE PES General Meeting Conf. and Exposition, National Harbor, USA, 2014, pp. 15.
    22. 22)
      • 22. Wei, W., Liu, F., Mei, S.: ‘Dispatchable region of the Variable wind generation’, IEEE Trans. Power Syst., 2015, 30, (5), pp. 27552765.
    23. 23)
      • 23. Wang, C., Liu, F., Wang, J., et al: ‘Risk-Based admissibility assessment of wind generation integrated into a bulk power system generation integrated into a bulk power system’, IEEE Trans. Sust. Energy, 2016, 7, (1), pp. 325336.
    24. 24)
      • 24. Bludszuweit, H., Antonio Dominguez-Navarro, J., Llombart, A.: ‘Statistical analysis of wind power prediction error’, IEEE Trans. Power Syst., 2008, 23, (3), pp. 983991.
    25. 25)
      • 25. Hodge, B., Milligan, M.: ‘Wind power forecasting error distributions over multiple timescales’. Proc. IEEE PES General Meeting Conf., Detroit, USA, 2011, pp. 18.
    26. 26)
      • 26. Lu, N., Diao, R., Hafen, R.P., et al: ‘A comparison of prediction error generators for modeling wind and load uncertainty’. IEEE PES General Meeting, Vancouver, Canada, 2013, pp. 15.
    27. 27)
      • 27. CPLEX User's Manual, IBM, Armonk, New York, 2015, release 12.6.1.
    28. 28)
      • 28. GUROBI User's Manual, GUROBI., 2016, release 6.5.
    29. 29)
      • 29. Lofberg, J.: ‘Yalmip: a toolbox for modeling and optimization in matlab’. Proc. IEEE Int. Symp. on Computer Aided Control Systems Design, Taipei, 2004, pp. 284289.
    30. 30)
      • 30. Dudurych, I.M., O'Sullivan, J., Rogers, A., et al: ‘Tools for handling high amounts of wind generation in national control centre in Ireland’. Proc. IEEE PES General Meeting Conf., San Diego, USA, 2012, pp. 18.
http://iet.metastore.ingenta.com/content/journals/10.1049/joe.2018.8603
Loading

Related content

content/journals/10.1049/joe.2018.8603
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address