access icon openaccess Multi-objective optimal scheduling strategy for wind power, PV and pumped storage plant in VSC-HVDC grid

Zhangbei demonstration project will be the world's highest voltage level and largest capacity VSC-HVDC power grid, by which millions of kilowatts of renewable energy and pumped storage power will be supplied to Beijing. Due to the uncertainty of wind power and solar power, and the operating range restriction of pumped storage unit, it is urgent to find the solution to the problem of plan making of pumped storage generation and convertor substation after the Zhangbei demonstration project completes. This paper analyses the fluctuation characteristics of renewable energy generation in converter substation, based on the t-location scale, then proposes a multi-objective optimal scheduling strategy for wind power, PV, and pumped storage plant in VSC-HVDC grid, with maximum energy consumption and minimum power fluctuation at the load side and vicinity of the adjusting side as the target, considering the constraints from day-ahead forecasts, VSC-HVDC capacity, unit start-up–shutdown, and state conversion. Simulation results show that authors’ strategy can make use of pumped storage power plant to inhibit the fluctuation of renewable energy power and make the maximum renewable energy consumption within the allowed power fluctuation at the sides, attaining a good balance between energy consumption and grid security.

References

    1. 1)
      • 6. Boming, Z., Wenchuan, W., Taiyi, Z., et al: ‘Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration’, Autom. Electr. Power Syst., 2011, 35, (1), pp. 16.
    2. 2)
      • 3. Zechun, H., Huajie, D., Tao, K.: ‘A joint daily operational optimization model for wind power and pumped-storage plant’, Autom. Electr. Power Syst., 2012, 36, (2), pp. 3641.
    3. 3)
      • 2. Qingran, W., Guohui, X., Lizi, Z.: ‘An integrated generation-consumption dispatch model with wind power’, Autom. Electr. Power Syst., 2011, 35, (5), pp. 1518.
    4. 4)
      • 4. Garcia-Gonzalez, J., Muela, R.M.R.D.L., Santos, L.M., et al: ‘Stochastic joint optimization of wind generation and pumped-storage units in an electricity market’, IEEE Trans. Power Syst., 2008, 23, (2), pp. 460468.
    5. 5)
      • 5. Castronuovo, E.D., Lopes, J.A.P.: ‘Optimal operation and hydro storage sizing of a wind–hydro power plant’, Int. J. Electr. Power Energy Syst., 2004, 26, (10), pp. 771778.
    6. 6)
      • 7. Deyou, L., Zhizhong, T., Feng, W.: ‘Study on combined system with wind power and pumped storage power’, Water Resour. Power, 2006, 24, (6), pp. 3942.
    7. 7)
      • 1. National Development and Reform Commission: ‘Development planning of renewable energy demonstration area in zhangjiakou city, hebei province’, 2015.
    8. 8)
      • 9. Bin, X.: ‘Research and application of multi-objective optimization algorithms base on differential evolution’. PhD thesis, ECUST, 2013.
    9. 9)
      • 8. Mao, Y., Gang, D.: ‘Wind power probability prediction based on t location-scale distribution’, Electr. Power, 2017, 50, (1), pp. 140145.
    10. 10)
      • 10. Huancai, H.: ‘Research on unit commitment problem based on original-dual interior point method and mixed integer programming’, Guizhou Electr. Power Technol., 2013, 16, (11), pp. 4246.
http://iet.metastore.ingenta.com/content/journals/10.1049/joe.2018.8435
Loading

Related content

content/journals/10.1049/joe.2018.8435
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address