Lambda of Lagrangian relaxation solution to unit commitment problem
Lambda of Lagrangian relaxation solution to unit commitment problem
- Author(s): A.G. Bakirtzis and C.E. Zoumas
- DOI: 10.1049/ip-gtd:20000173
For access to this article, please select a purchase option:
Buy article PDF
Buy Knowledge Pack
IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.
Thank you
Your recommendation has been sent to your librarian.
- Author(s): A.G. Bakirtzis 1 and C.E. Zoumas 1
-
-
View affiliations
-
Affiliations:
1: Department of Electrical and Computer Engineering, Aristotle University of Thessaloniki, Greece
-
Affiliations:
1: Department of Electrical and Computer Engineering, Aristotle University of Thessaloniki, Greece
- Source:
Volume 147, Issue 2,
March 2000,
p.
131 – 137
DOI: 10.1049/ip-gtd:20000173 , Print ISSN 1350-2360, Online ISSN 1359-7051
The difference between the lambda values of the economic dispatch and the unit commitment problems is presented, based on the economic interpretation of the Lagrangian relaxation solution framework. Although both sets of lambdas represent marginal cost of electricity, the underlying assumptions on their computation in the two problems are different, as explained. Results of two case studies that support the above differences are presented.
Inspec keywords: power generation economics; power generation dispatch
Other keywords: economic dispatch; Lagrangian relaxation lambda; marginal electricity cost; unit commitment
Subjects: Power system management, operation and economics; Administration and management; Management issues
References
-
-
1)
- R.R. Shoults , S.K. Chang , S. Helmick , W.M. Grady . A practical approach tounit commitment, economic dispatch, and savings allocation for multiple-areapool operation with import/export constraints. IEEE Trans. Power Appar. Syst. , 2 , 625 - 633
-
2)
- A.I. Cohen , S.H. Wan . A method for solving the fuel constrained unitcommitment problem. IEEE Trans. Power Syst. , 3 , 608 - 614
-
3)
- S. Ruzic , N. Rajakovic . A new approach for solving the extended unitcommitment problem. IEEE Trans. Power Syst. , 1 , 269 - 275
-
4)
- P.B. Luh , D. Zhang , R. Tomastic . An algorithm for solving the dual problem ofhydrothermal scheduling. IEEE Trans. Power Syst. , 3 , 986 - 991
-
5)
- S. Ruzic , N. Rajakovic , A. Vuckovic . A flexible approach to short-termhydro-thermal coordination. Part I: Problem formulation and general solutionprocedure. IEEE Trans. Power Syst. , 3 , 1564 - 1571
-
6)
- W.L. Peterson , S.R. Brammer . A capacity based Lagrangian relaxation unitcommitment with ramp rate constraints. IEEE Trans. Power Syst. , 2 , 1077 - 1083
-
7)
- A. Merlin , P. Sandrin . A new method For unit commitment at Électricité deFrance. IEEE Trans. Power Appar. Syst. , 2 , 1218 - 1225
-
8)
- F. Zhuang , F.D. Galiana . Towards a more rigorous and practical unit commitment by Lagrangian relaxation. IEEE Trans. Power Syst. , 2 , 763 - 773
-
9)
- S. Ruzic , A. Vuckovic , N. Rajakovic . A flexible approach to short-termhydro-thermal coordination. Part II: Dual problem solution procedure. IEEE Trans. Power Syst. , 3 , 1572 - 1578
-
10)
- G.S. Lauer , N.R. Sandell , D.P. Bertsekas , T.A. Posbergh . Solution of largescale optimal unit commitment problems. IEEE Trans. Power Appar. Syst. , 1 , 79 - 86
-
11)
- S. Virmani , C. Adrian , K. Imhof , S. Mukherjee . Implementation of a Lagrangianrelaxation based unit commitment problem. IEEE Trans. Power Syst. , 4 , 1373 - 1380
-
12)
- R. Baldick . The generalized unit commitment problem. IEEE Trans. Power Syst. , 1 , 465 - 475
-
13)
- A.I. Cohen , M. Yoshimura . A branch and bound algorithm for unitcommitment. IEEE Trans. Power Appar. Syst. , 2 , 444 - 451
-
14)
- W.L. Snyder , H.D. Powell , J.C. Rayburn . Dynamic programming approach to unit commitment. IEEE Trans. Power Syst. , 2 , 339 - 350
-
15)
- K.D. Le , J.T. Day , B.L. Cooper , E.W. Gibbons . A global optimisation methodfor scheduling thermal generation, hydro generation, and economy purchases. IEEE Trans. Power Appar. Syst. , 7 , 1986 - 1993
-
16)
- F.N. Lee . Short-term unit commitment - A new method. IEEE Trans. Power Syst. , 2 , 421 - 428
-
17)
- (1998) Pool payments.
-
18)
- S.Y. Hao , G.A. Angelidis , H. Singh , A.D. Papalexopoulos . Consumer paymentminimisation in power pool auctions. IEEE Trans. Power Syst. , 3 , 986 - 991
-
1)

Related content