Power system planning inherently needs to consider all aspects of how a power system may be planned and operated to provide a reliable and economic supply of electrical energy. This includes the need to simulate generation production, particularly the appropriate co-ordination between thermal and hydrogeneration. One of the most difficult features of this is the incorporation of limited-energy pumped-storage hydrogeneration within such simulations. This paper describes a new approach for incorporating pumped-storage units using sequential Monte Carlo simulation. The scheduling is defined as a constrained optimisation problem using a network flow algorithm. The application and benefits of the proposed model are demonstrated using the IEEE reliability test system.
References
-
-
1)
-
A. Invernizzi ,
G. Manzoni
.
Probabilistic simulation of generating system operationincluding seasonal hydro reservoirs and pumped-storage.
Electr. Power Energy Syst.
,
1 ,
25 -
35
-
2)
-
J.A. Bloom ,
L. Gallant
.
Modelling dispatch constraints in production simulations basedequivalent load method.
IEEE Trans.
,
2 ,
598 -
611
-
3)
-
A.J. Wood ,
B.F. Wollenberg
.
(1996)
Power generation, operation and control.
-
4)
-
Nanahara ,
Takimoto
.
A study on required reservoir size for pumped hydro storage.
IEEE Trans.
,
1 ,
318 -
323
-
5)
-
R.N. Allan ,
J. Roman
.
Reliability assessment of hydrothermal composite system by meansof stochastic simulation techniques.
Reliab. Eng. Syst. Saf.
,
1 ,
33 -
47
-
6)
-
Paris, L., Salvaderi, L.: `Pumped-storage plant basic characteristics: their effect on generatingsystem reliability', Proceedings of American Power conference, 1974, 36, p. 403–418.
-
7)
-
A.J. Conejo ,
M.C. Caramanis ,
J.A. Bloom
.
An efficient algorithm for optimal reservoirutilization in probabilistic production costing.
IEEE Trans.
,
2 ,
439 -
447
-
8)
-
IEEE Reliability Test System.
IEEE Trans.
,
6 ,
2047 -
2054
-
9)
-
A. Breipohl ,
F.N. Lee
.
Stochastic production cost simulation.
Reliab. Eng. Syst. Saf.
,
1 ,
101 -
107
-
10)
-
S. Kim ,
M. Rhee
.
An application of the Lagrangian relaxation method to unit commitmentscheduling in a power generation system with pumped-storage units.
Comput. Ind. Eng.
,
1
-
11)
-
R. Billinton ,
R.N. Allan
.
(1988)
Reliability assessment of large electric power systems.
-
12)
-
Manhire, B., Jenkins, R.T.: `BENCHMARK: A Monte Carlo hourly chronological simulationmodel which includes effects of ramp rates and reservoir constraints', Presented at the conference Generation planning: modellingand decision making, August 1982, Chattanooga, TN, USA.
-
13)
-
Kennington ,
Helgason
.
(1980)
Algorithms for network programming.
-
14)
-
R.N. Allan ,
J. Roman
.
Reliability assessment of composite hydrothermal generation systemscontaining pumped storage plant.
IEE Proc. C
,
6 ,
471 -
478
http://iet.metastore.ingenta.com/content/journals/10.1049/ip-gtd_19982191
Related content
content/journals/10.1049/ip-gtd_19982191
pub_keyword,iet_inspecKeyword,pub_concept
6
6