Failure of the London Underground's 22 kV power supply system – an exercise in logic and transport management

Access Full Text

Failure of the London Underground's 22 kV power supply system – an exercise in logic and transport management

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IEE Proceedings - Electric Power Applications — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

The power supply to the north-east sector of London Underground Ltd's Central Line, and therefore the train service, was out of service for the majority of the time between the 24th and the 29th November 1993. During this period the power system faults were investigated, identified and corrected. This incident was the most extensive power fault on London Underground's power supply system in its recent history. The key cause was identified as an earth fault on a neutral cable of an alternator, which was located several kilometres from the part of the network that became inoperative. London Underground's power 22 kV generation and distribution system is described, and the feed arrangements historically made to minimise the possibility of such an extensive outage are explained. The events leading to the loss of supply, subsequent identification and correction of the underlying main fault are described, and a model of the 150 Hz harmonic earth-return current, which was the immediate cause of tripping owing to a series resonant circuit condition, is included. The effect of the neutral cable fault was to increase the 150 Hz current to the point where it caused simultaneous multiple feeder breaker trips from earth-fault relays for the feeders supplying the north-east sector of the Central Line, resulting in loss of power to that sector. A comparison is made between the model and practically measured results.

Inspec keywords: earthing; relay protection; railways; power system relaying; power system harmonics; power distribution faults; power distribution protection; harmonic distortion

Other keywords: simultaneous multiple feeder breaker trips; 22 kV; 150 Hz; alternator neutral cable; series resonant circuit condition; London Underground; power supply system failure; earth-fault relays; Central Line; distribution system; harmonic earth-return current; earth fault; power system faults; generation system

Subjects: Distribution networks; Power system protection; Transportation; Power supply quality and harmonics

References

    1. 1)
      • B. Mellitt . Customer first - engineering the underground. IEE Power Eng. J. , 7 - 16
    2. 2)
      • M. Bletcher . Electricity supply system on the London underground. IEE Power Eng. J. , 317 - 324
    3. 3)
      • S.J. Ghazanfari , J. Allan , K. Payne , D. Knights . Optimisation of AC feeder topology for a DC supplied rapid-transit railway. IEE. Proc. Electr. Power Appl. , 4 , 351 - 359
http://iet.metastore.ingenta.com/content/journals/10.1049/ip-epa_20000518
Loading

Related content

content/journals/10.1049/ip-epa_20000518
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading