Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Computer-based supervisory control and energy management system for the city of Cape Town

Computer-based supervisory control and energy management system for the city of Cape Town

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IEE Proceedings C (Generation, Transmission and Distribution) — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Cape Town City Council is responsible for the supply of electricity to the city area. To achieve this, the council owns and operates thermal and pumped-storage power stations and extensive HV transmission and LV distribution networks. Power is also purchased from the national supply authority. Prior to the introduction of the control system described in this paper limited supervisory control and data acquisition facilities existed to provide some degree of remote control for the network. In addition to duties associated with supervision of both the HV and LV networks, the control centre operators were also responsible for energy management involving generator scheduling and control, and load-shedding when required. To assist the operators in their extensive and onereous duties a new computer-based control centre has been developed and was commissioned in 1984. Because of the unusual mix of power sources special software had to be developed for energy management purposes. Descriptions are given of the functional and practical aspects of the control centre, and of associated hardware and software facilities and also some commissioning experiences.

References

    1. 1)
      • `Human factors of electric power despatch control centres Volume 1: Survey of results summary', Interim Report, July 1981.
    2. 2)
      • Liacco, T.E.: `New developments in computer configurations for control centres', IEE Conf. Publ. 187 — Power system monitoring and control, June 1980, p. 9–15.
    3. 3)
      • Muller, M.: `Short term load predication in electric power systems', operational research in progress — Joint meeting of Austria and Swiss operational research societies, 1980.
    4. 4)
      • M.J.H. Sterling . (1978) , Power system control.
    5. 5)
      • M.S. Abou-Hussien , M.S. Kandil , M.A. Tantnwy , S.A. Farghal . An accurate model for short term load forecasting. IEEE Trans. , 4158 - 4165
    6. 6)
      • G.G.R. Argent , H.N.F. Pells , J. Taylor , C.P. Strongman . Steenbras pumped storage scheme. SAIEE Trans. , 47 - 72
    7. 7)
      • R.R. Slatem , A.L. Taylor . Some protection, underfrequency load shedding and testing aspects of the ESCOM network. SAIEE Trans. , 350 - 367
http://iet.metastore.ingenta.com/content/journals/10.1049/ip-c.1988.0005
Loading

Related content

content/journals/10.1049/ip-c.1988.0005
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address