Controller testing facility on 32.5 MW water turbine

Controller testing facility on 32.5 MW water turbine

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IEE Proceedings C (Generation, Transmission and Distribution) — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

As part of a collaborative programme of work between university and industry on the control of hydro-generating units supplying power to the UK national grid, equipment has been installed on a 32.5 MW unit which permits the testing of new controllers in a realistic, operational environment. A central feature of this equipment, which includes a new independent high-pressure servomotor, is that it permits the generating unit to be returned quickly to operational use with its existing controller. Full integration with the power station operator's controls, automatic control scheme and protection, permit the controllers under test to be evaluated under normal operational conditions.

References

    1. 1)
      • G.W. Bryce , P.W. Agnew , T.R. Foord , D.J. Winning , A.G. Marshall . On-site investigation of electrohydraulic governors for water turbines. Proc. IEE , 2 , 147 - 153
    2. 2)
      • G.W. Bryce , T.R. Foord , D.J. Murray-Smith , P.W. Agnew . The use of a hybrid computer simulation in the investigation of water turbine governors. Simulation Council Proceedings Series , 1 , 35 - 44
    3. 3)
      • P.W. Agnew , G.W. Bryce . (1977) Optimising turbine operation by electronic governing, Water Power and Dam Construction.
    4. 4)
      • D.G.E. Findlay , H. Davie , T.R. Foord , A.G. Marshall , D.J. Winning . Microprocessor-based adaptive hydro turbine governor. IEE Proc. C, Gen., Trans., Distrib. , 5
    5. 5)
      • G. Kerensky , J.C. Beverly , E.J.K. Chapman . The Loch Sloy Hydro-electric Development, Parts I, II and III. Proc. I. Mech. E. , 205 - 232
http://iet.metastore.ingenta.com/content/journals/10.1049/ip-c.1980.0056
Loading

Related content

content/journals/10.1049/ip-c.1980.0056
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address