Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

access icon free Critical success factors for offshore software outsourcing contract management from vendors’ perspective: an exploratory study using a systematic literature review

Offshore software development outsourcing is a recent and widely used business strategy for the development of high quality products at low cost. The objective of the research presented in this study is to find critical success factors (CSFs) for contract management to assist vendor organisations for successful outcomes of the offshore software outsourcing contract. A systematic literature review (SLR) process was performed for the identification of factors that can assist vendor organisations in successful management of the various activities at different stages of the outsourcing contract. that is, pre-contract, during contract and post-contract. Our findings reveal that ‘contract flexibility, ‘trustworthy relationship management’, ‘competitive bidding’, ‘consultation and negotiation’ and ‘quality management’ are considered as the CSFs for outsourcing vendor organisations in planning, management and execution of outsourcing contract.

References

    1. 1)
      • 5. Palvia, P.C.: ‘A dialectic view of information systems outsourcing – pros and cons’, Inf. Manage., 1995, 29, (5), pp. 265275 (doi: 10.1016/0378-7206(95)00030-9).
    2. 2)
      • 46. Kern, T.: ‘The gestalt of an information technology outsourcing relationship: an exploratory analysis’. Proc. 18th Int. Conf. on Information Systems, 1997, Atlanta, Georgia, 1997, pp. 3758.
    3. 3)
      • 22. Aubert, B., Rivard, S., Patry, M.: ‘A transaction cost approach to outsourcing behaviour: some empirical evidence’, Inf. Manage., 1996, 30, pp. 5164 (doi: 10.1016/0378-7206(95)00045-3).
    4. 4)
      • 34. Bradstreet, D.: ‘Dun & Bradstreet's Barometer of Global Outsourcing’ (Dun & Bradstreet, 2000).
    5. 5)
      • 26. Khan, S.U., Niazi, M., Rashid, A.: ‘Factors influencing clients in the selection of offshore software outsourcing vendors: an exploratory study using a systematic literature review’, J. Syst. Softw., 2011, 84, pp. 686699 (doi: 10.1016/j.jss.2010.12.010).
    6. 6)
      • 4. Kern, T., Willcocks, L.: ‘Exploring information technology outsourcing relationships: theory and practice’, J. Strateg. Inf. Syst., 2000, 9, (4), pp. 321350 (doi: 10.1016/S0963-8687(00)00048-2).
    7. 7)
      • 13. http://www.O2pi.com. Outsourcing Survey Report, 2008 (http://www.www.o2pi.com), 2008.
    8. 8)
      • 64. Hagel, J., Brown, J.S.: ‘The only sustainable edge’ (Harvard Business School Press, Boston, 2005).
    9. 9)
      • 21. Klepper, R.: ‘The management of partnering development in I/S outsourcing’, J. Technol., 1995, 10, pp. 239247 (doi: 10.1057/jit.1995.27).
    10. 10)
      • 33. Lacity, M., Willcocks, L.: ‘An empirical investigation of Information Technology sourcing practices: lesson from experience’, Mis Q., 1998, 22, (3), pp. 263408 (doi: 10.2307/249670).
    11. 11)
      • 27. Babin, R., Schuster, C.: ‘Building innovation in to the outsourcing relationship: a case study’, J. Inf. Technol. Teach. Cases, 2012, 2, (2), pp. 98103 (doi: 10.1057/jittc.2012.10).
    12. 12)
      • 25. Vieru, D., Rivard, S.: ‘Organisational identity, partnership and IT outsourcing: the dynamic of global sourcing’, Perspect. Pract., 2012, 130, pp. 93104.
    13. 13)
      • 71. Martin, B.: ‘An introduction to medical statistics’ (Oxford medical Publications, 2000, 3rd edn.).
    14. 14)
      • 40. Qi, C., Chau, P.Y.K.: ‘Relationship, contract and IT outsourcing success: evidence from two descriptive case studies’, Decis. Support Syst., 2012, 53, pp. 859869 (doi: 10.1016/j.dss.2012.05.018).
    15. 15)
      • 31. Li, W., Gwebu, K.L., Wang, J., Zhu, D.X.: ‘The aftermath of information technology: an empirical study of firm performance following outsourcing decisions’, J. Inf. Syst., 2008, 22, (1), pp. 125159.
    16. 16)
      • 28. Gonzalez, R., Gasco, J., Liopis, J.: ‘Information systems outsourcing risks: a study of large firms’, Ind. Manage. Data Syst., 2005, 105, (1), pp. 4562 (doi: 10.1108/02635570510575180).
    17. 17)
      • 45. Klepper, R.: ‘The management of partnering development in IS outsourcing’, J. Global Inf. Technol., 1995, 10, (4), pp. 249258 (doi: 10.1057/jit.1995.28).
    18. 18)
      • 51. Magdaleno, A.M., Werner, C.M.L., de Araujo, R.M.: ‘Reconciling software development models: a quasi-systematic review’, J. Syst. Softw., 2012, 85, pp. 351369 (doi: 10.1016/j.jss.2011.08.028).
    19. 19)
      • 61. Rohde, F.H.: ‘IS/IT outsourcing practices of small- and medium-sized manufacturers’, Int. J. Account. Inf. Syst., 2004, 5, pp. 429451 (doi: 10.1016/j.accinf.2004.04.006).
    20. 20)
      • 32. Bengtsson, L., Mandar, D.: ‘Manufacturing outsourcing and its effect on plant performance – lessons from KIBS outsourcing’, J. Evol. Econ., 2009, 19, pp. 231257 (doi: 10.1007/s00191-008-0129-1).
    21. 21)
      • 72. Hossain, E., Ali-Babar, M., Hye-young, P.: ‘Using scrum in global software development: a systematic literature review’. IEEE Int. Conf. on Global Software Engineering (ICGSE09; 2009), Lero, Limerick, Ireland, 2009, pp. 175184.
    22. 22)
      • 11. McLaughlin, L.: ‘An eye on India: outsourcing debate continues’, IEEE Softw., 2003, 20, (3), pp. 114117 (doi: 10.1109/MS.2003.1196336).
    23. 23)
      • 18. Cliff, S.: ‘Badly-managed offshore software development costs firms millions’ (Computer Weekly, 2004).
    24. 24)
      • 41. Fitzgeral, G., Willcocks, L.: ‘Contracts and partnerships in the outsourcing of IS’. Proc. 15th Int. Conf. on Information Systems, 1994, pp. 9198.
    25. 25)
      • 42. Goo, J., Kishore, R., Rao, H.R., Nam, K.: ‘The role of service level agreements in relational management of information technology outsourcing: an empirical study’, Mis Q., 2009, 33, (1), pp. 119145.
    26. 26)
      • 19. Khan, S.U., Niazi, M., Ahmad, R.: ‘An empirical investigation of success factors for offshore software development outsourcing vendors’, IET Softw., 2012, 6, (1), pp. 115 (doi: 10.1049/iet-sen.2010.0038).
    27. 27)
      • 74. Khan, S.U., Niazi, M., Ahmad, R.: ‘A readiness model for software outsourcing vendors readiness model’. IEEE Int. Conf. Global Software Engineering (ICGSE-08; 2008), Bangalore, India, 2008, pp. 273277.
    28. 28)
      • 14. Smite, D., Wohlin, C., Gorschek, T., Feldt, R.: ‘Empirical evidence in global software engineering: a systematic review’, Empir. Softw. Eng., 2010, 15, (1), pp. 91118 (doi: 10.1007/s10664-009-9123-y).
    29. 29)
      • 69. Alam, A.U., Khan, S.U.: ‘Knowledge sharing management in offshore software development outsourcing relationships from vendors’ perspective: a systematic literature review protocol’. Proc. Fifth Malaysian Conf. in Software Engineering (MYSEC; 2011), Malaysia, 2011.
    30. 30)
      • 73. Khan, A.W., Khan, S.U.: ‘Outsourcing contract management model (OCMM)’. Proc. 13th Int. Conf. on Product-Focused Software Development and Process Improvement (Profess), Madrid, Spain, 13–15 June 2012, pp. 2735.
    31. 31)
      • 36. Sakthivel, S.: ‘Managing risk in offshore systems development’, Commun. ACM, 2007, 50, (4), pp. 6975 (doi: 10.1145/1232743.1232750).
    32. 32)
      • 44. Chittenden, J.: ‘IT Outsourcing Part 2: Managing the Sourcing Contract. A management guide’ (Van Haren Publishing, Zaltbommel, 2010).
    33. 33)
      • 6. HR Report. Available at http://www.hrotoday.com/main.asp?FAQ#Q2, July–August 2003.
    34. 34)
      • 30. Gartner: ‘Worldwide IT outsourcing revenue’ (ET Bureau, 2012).
    35. 35)
      • 9. King, W.R.: ‘Outsourcing and offshoring: the new IS paradigm?’, J. Global Inf. Manage., 2005, 8, (2), pp. 14.
    36. 36)
      • 63. Deng, C.-P., Mao, J.-Y., Wang, G.-S.: ‘An empirical study on the source of vendors’ relational performance in offshore information systems outsourcing’, Int. Bus. Rev. J. Inf. Manage., 2012 In press.
    37. 37)
      • 39. Gang, H., Tate, M., Aborz, S.: ‘Managing the outsourcing marriage to achieve success’ (IEEE, 2007).
    38. 38)
      • 62. Kim, B.S.: ‘Systematic prioritization of considerations in making offshore software development outsourcing decisions [bachelor of science in electrical engineering and computer science]’ (MIT, 2005).
    39. 39)
      • 65. Bhatnagar, S.C., Madon, S.: ‘The Indian software industry: moving towards maturity’, J. Inf. Technol., 1997, 12, (4), pp. 277288 (doi: 10.1080/026839697345008).
    40. 40)
      • 43. Chou, D.C., Chou, A.Y.: ‘Information systems outsourcing life cycle and risks analysis’, Comput. Stand. Interfaces, 2009, 31, (5), pp. 10361043 (doi: 10.1016/j.csi.2008.09.032).
    41. 41)
      • 12. Shao, B., David, J.S.: ‘The impact of offshore outsourcing on IT workers in developed countries’, Commun. ACM, 2007, 50, (2), pp. 8994 (doi: 10.1145/1216016.1216026).
    42. 42)
      • 56. Huai, J.: ‘Mitigating outsourcing risk through relational contract’. Proc. Fourth Int. Conf. Wireless Communications, Networking and Mobile Computing, 2008 (WiCOM '08; 2008), School of Economics & Management, East China Jiaotong University, Nanchang, 2008, pp. 14.
    43. 43)
      • 17. Rao, M.T., Poole, W., Raven, P.V., Lockwood, D.L.: ‘Trends, implications, and responses to global it sourcing: a field study’, J. Global Inf. Technol. Manage., 2006, 9, (3), pp. 523.
    44. 44)
      • 67. Raisinghani, M.S., Starr, B., Hickerson, B., Morrison, M., Howard, M.: ‘Information technology/systems offshore outsourcing: key risks and success factors’, J. Inf. Technol. Res., 2008, 1, (1), pp. 7292 (doi: 10.4018/jitr.2008010107).
    45. 45)
      • 7. Minoli, D.: ‘Analyzing outsourcing’ (McGraw-Hill, Inc., New York, 1995).
    46. 46)
      • 49. Kitchenham, B., Brereton, O.P., Budgen, D., Turner, M., Bailey, J., Linkman, S.: ‘Systematic literature reviews in software engineering – a systematic literature review’, Inf. Softw. Technol., 2009, 51, (1), pp. 715 (doi: 10.1016/j.infsof.2008.09.009).
    47. 47)
      • 38. Vagadia, B.: ‘Minimising risk through relationships’. Management for Professionals; 2012, Berlin, Heidelberg, 2012, pp. 155173.
    48. 48)
      • 16. Khan, N., Currie, W.L., Weerakkody, V., Desai, B.: ‘Evaluating offshore IT outsourcing in India: supplier and customer scenarios’. Proc. 36th Annual Hawaii Int. Conf. System Sciences; 2003, Hawaii, USA, 2003.
    49. 49)
      • 23. Lee, M.K.O.: ‘IT outsourcing contract: practical issues for management’ European Management Journal, 2003.
    50. 50)
      • 10. Bush, A., Tiwana, A., Tsuji, H.: ‘An empirical investigation of the drivers of software outsourcing decisions in Japanese organizations’, Inf. Softw. Technol. J., 2007, 50, (6), pp. 499510 (doi: 10.1016/j.infsof.2007.08.006).
    51. 51)
      • 55. Holto, J.: ‘Building trust and collaboration in a virtual team’, Team Perform. Manage., 2001, 7, (3), pp. 3647 (doi: 10.1108/13527590110395621).
    52. 52)
      • 35. Iacovou, C.L., Nakatsu, R.: ‘A risk profile of offshore-outsourced development projects’, Commun. ACM, 2008, 51, (6), pp. 8994 (doi: 10.1145/1349026.1349044).
    53. 53)
      • 75. Khan, S.U., Niazi, M.: ‘Software outsourcing vendors’ readiness model (SOVRM) [PhD]’ (Keele University UK, 2011).
    54. 54)
      • 66. Terdiman, R., Karamouzis, F.: ‘Going offshore to globally source it services. Technical Report: Gartner Research, available at http://hcm.metagroup.com/resources/103900/103916/103916.pdf, June 2009.
    55. 55)
      • 52. Khan, A.W., Khan, S.U.: ‘Offshore software development outsourcing contract from vendors’ perspective: a systematic literature review protocol’, IOSR J. Comput. Eng. (IOSRJCE), 2012, 2, (4), pp. 2637 (doi: 10.9790/0661-0242637).
    56. 56)
      • 1. Khan, S.U.: ‘Software outsourcing vendors’ readiness model’. PhD thesis, School of Computing & Maths, Keele University, UK, 2011.
    57. 57)
      • 8. United-Nations. World Investment Report. The shift towards services, New York and Geneva, 2004.
    58. 58)
      • 48. Jorgensen, M., Shepperd, M.: ‘A systematic review of software development cost estimation studies’, IEEE Trans. Softw. Eng., 2007, 33, (1), pp. 3353 (doi: 10.1109/TSE.2007.256943).
    59. 59)
      • 2. Lago, P., Muccini, H., Ali-Babar, M.: ‘Developing a course on designing software in globally distributed teams’. IEEE Int. Conf. on Global Software Engineering (ICGSE08; 2008), 2008, pp. 249253.
    60. 60)
      • 60. Frisanco, T., Anglberger, N., Ang, R., Onu, S.: ‘Project management – a holistic approach for managed services’. Int. Conf. on Management Science & Engineering (15th); 2008, Long Beach, USA, 2008.
    61. 61)
      • 15. Chou, D.C., Chou, A.Y.: ‘Innovation outsourcing: risks and quality issues’, Comput. Stand. Interfaces, 2011, 33, pp. 350356 (doi: 10.1016/j.csi.2010.10.001).
    62. 62)
      • 37. Khan, S.U., Niazi, M., Ahmad, R.: ‘Barriers in the selection of offshore software development outsourcing vendors: an exploratory study using a systematic literature review’, Inf. Softw. Technol., 2011, 53, pp. 693706 (doi: 10.1016/j.infsof.2010.08.003).
    63. 63)
      • 57. Bhalla, A., Sodhi, M.S., Son, B.-G.: ‘Is more IT offshoring better? an exploratory study of western companies offshoring to South East Asia’, J. Oper. Manage., 2008, 26, (2), pp. 322335 (doi: 10.1016/j.jom.2007.02.005).
    64. 64)
      • 3. Ali-Babar, M., Verner, J., Nguyen, P.: ‘Establishing and maintaining trust in software outsourcing relationships: an empirical investigation’, J. Syst. Softw., 2007, 80, (9), pp. 14381449 (doi: 10.1016/j.jss.2006.10.038).
    65. 65)
      • 50. Chen, L., Babar, M.A.: ‘A systematic review of evaluation of variability management approaches in software product lines’, Inf. Softw. Technol., 2011, 53, pp. 344362 (doi: 10.1016/j.infsof.2010.12.006).
    66. 66)
      • 70. Lee, J.N., Kim, Y.G.: ‘Understanding outsourcing partnership: a comparison of three theoretical perspectives’, IEEE Trans. Eng. Manage., 2005, 52, (1), pp. 4358 (doi: 10.1109/TEM.2004.839958).
    67. 67)
      • 68. Alam, A.U., Khan, S.U., Ali, I.: ‘Knowledge sharing management risks in outsourcing from various continents perspective: a systematic literature review’, Int. J. Digital Content Technol. Appl., 2012, 6, (21), pp. 2733 (doi: 10.4156/jdcta.vol6.issue21.4).
    68. 68)
      • 59. Rao, N.M.: ‘Challenges in execution of outsourcing contracts’. ISEC'09, Pune, India, 23–26 February 2009.
    69. 69)
      • 24. Gong, H., Tate, M., Alborz, S.: ‘Managing the outsourcing marriage to achieve success’. Proc. 40th Annual Hawaii Int. Conf. on System Sciences (HICSS07, 2007), 2007.
    70. 70)
      • 20. Khan, S.U., Niazi, M.: ‘Critical challenges in offshore software development outsourcing: an empirical study’. Int. IASTED Conf. on Software Engineering SE, Greece, June 2012.
    71. 71)
      • 53. Khan, S.U., Niazi, M., Rashid, A.: ‘Critical success factors for offshore software development outsourcing vendors: a systematic literature review’. Proc. Fourth IEEE Int. Conf. on Global Software Engineering, (ICGSE09; 2009), Lero, Limerick, Ireland, 2009, pp. 207216.
    72. 72)
      • 54. Ishizaka, A., Blakiston, R.: ‘The 18C's model for a successful long-term outsourcing arrangement’, Ind. Mark. Manage., 2012, 41, (7), pp. 10711080 (doi: 10.1016/j.indmarman.2012.02.006).
    73. 73)
      • 47. Kitchenham, B., Charters, C.: ‘Guidelines for performing systematic literature reviews in software engineering, Keele University and Durham University Joint Report, Report No.: EBSE 2007–001, 2007.
    74. 74)
      • 29. Shah, A.: ‘Gartner upgrades worldwide IT spending forecast’, Comput. World, 2011.
    75. 75)
      • 58. Hanna, R., Daim, T.: ‘Critical success factors in outsourcing: case of software industry’. IEEE Conf. PICMET 2007, USA, 2007.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-sen.2013.0013
Loading

Related content

content/journals/10.1049/iet-sen.2013.0013
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address