http://iet.metastore.ingenta.com
1887

Failure analysis and maintenance of a surge capacitor on the neutral bus in a ±500 kV HVDC converter station

Failure analysis and maintenance of a surge capacitor on the neutral bus in a ±500 kV HVDC converter station

For access to this article, please select a purchase option:

Buy article PDF
$19.95
(plus tax if applicable)
Buy Knowledge Pack
10 articles for $120.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Renewable Power Generation — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

This study analyses a surge capacitor failure on the neutral bus in a ±500 kV high voltage direct current (HVDC) converter station. Both overvoltage and insulation of the surge capacitor are investigated through simulation, practical record data analysis, and experimentation. A highly accurate HVDC model is established on the basis of the topological structure and parameters of the HVDC project. Using this model, the failure process is simulated by combining neutral bus overvoltage record analysis and voltage divider performance test. Results indicate that the 246 kV uncharacteristically high overvoltage on the neutral bus is a measurement error caused by voltage divider fault. From the field test, difference equation of the voltage divider is derived to reconstruct the actual overvoltage, the amplitude of which is 73 kV. The amplitude is significantly lower than that of the switching impulse withstand level of the surge capacitor, which should not cause capacitor failure. Therefore, the primary cause of capacitor failure is insulation damage rather than overvoltage. Finally, maintenance measures are proposed and applied in the station.

http://iet.metastore.ingenta.com/content/journals/10.1049/iet-rpg.2015.0451
Loading

Related content

content/journals/10.1049/iet-rpg.2015.0451
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address