Expanding interconnection capacity to integrate intermittent generation in the Iberian Peninsula
- Author(s): Camila Fernandes 1 ; Pablo Frías 1 ; Luis Olmos 1
-
-
View affiliations
-
Affiliations:
1:
Instituto de Investigación Tecnológica, Universidad Pontificia Comillas, C/Santa Cruz de Marcenado 26, 28015 Madrid, Spain
-
Affiliations:
1:
Instituto de Investigación Tecnológica, Universidad Pontificia Comillas, C/Santa Cruz de Marcenado 26, 28015 Madrid, Spain
- Source:
Volume 7, Issue 1,
January 2013,
p.
45 – 54
DOI: 10.1049/iet-rpg.2012.0151 , Print ISSN 1752-1416, Online ISSN 1752-1424
Increasing penetration of intermittent energy sources in power systems has been requiring higher operational flexibility and cross-border transmission capacity. Intermittent generation, especially wind and solar power, has grown significantly in the Iberian Peninsula during the last decade and it will keep growing in the next year. Owing to limited interconnection capacity with the French and the Moroccan power systems, generation intermittency has been dealt with mostly within Spain and Portugal, helped by a flexible generation mix. Despite the relatively high flexibility of the Iberian system, in some situations, renewable generation output had to be curtailed. In general, renewable energy curtailment is an emergency action taken in case of network constraints or in case of generation surplus at single node. This emergency action is expected to be more common in the near future if no additional operating measures are taken. This study focuses on the expansion of interconnection capacity that would be required in order to integrate intermittent generation surplus in the Iberian Peninsula in the period 2020–2050. For this purpose, the trade-off between transmission investment costs and the costs of renewable energy curtailment is analysed. Results for different intermittent generation levels and price scenarios are presented and discussed.
Inspec keywords: power generation economics; pricing; distributed power generation; power system interconnection; solar power; power transmission economics; wind power plants; investment; wind power
Other keywords:
References
-
-
1)
-
4. Ministry of Economy, Innovation and Development: ‘New Energies Plan: ENE 2020’. (In Portuguese). Available at http://www.renewable.pt, 2010.
-
-
2)
-
18. Fernandes, C., Frías, P.: ‘Impact of intermittent generation on the expansion of the Spanish power system interconnection capacity’. IEEE PES PowerTech, Trondheim, Norway, June 2011.
-
-
3)
-
25. Ramos, A., Latorre, J.M., Báñez, F., et al: ‘Modelling the operation of electric vehicles in an operation planning model’. Proc. 17th Power Syst. Computation Conf. (PSCC), Stockholm, Sweden, August 2011.
-
-
4)
-
5. ENTSO-E: ‘Ten-Year Network Development Plan 2010–2020’. Available at http://www.entsoe.eu, 2010.
-
-
5)
-
8. Eurelectric: ‘Flexible generation: backing up renewables’. Available at http://www.eurelectric.org, 2011.
-
-
6)
-
31. Migliavacca, G., L'Abbate, A., Losa, I., Carlini, E.M., Sallati, A., Vergine, C.: ‘The REALISEGRID cost-benefit methodology to rank pan-European infrastructure investments’. Proc. IEEE PES PowerTech, Trondheim, Norway, June 2011.
-
-
7)
-
26. Dietrich, K., Latorre, J.M., Olmos, L., Ramos, A.: ‘Demand response in an isolated system with high wind integration’, IEEE Trans. Power Syst., 2012, 27, (1), pp. 20–29.
-
-
8)
-
23. E.VALUE: ‘New energy technologies: roadmap Portugal 2050’. (In Portuguese). Available at http://www.evalue.pt, 2011.
-
-
9)
-
19. Red Eléctrica de España: ‘The Spanish Electricity System 2010’. Available at http://www.ree.es/ingles/home.asp, 2011.
-
-
10)
-
21. Frías, P., Fernandes, C., Cossent, R., Olmos, L.: ‘Report from the regional study case: South-Western Europe (Spain)’. Deliverable 2.6 of the SUSPLAN EU Project, 2010.
-
-
11)
-
15. Ault, G.W., Bell, K.R.W., Galloway, S.J.: ‘Calculation of economic transmission connection capacity for wind power generation’, IET Renew. Power Gener., 2007, 1, (1), pp. 61–69.
-
-
12)
-
28. Ventosa, M., Rivier, M., Ramos, A., García-Alcade, A.: ‘An MCP approach for hydrothermal coordination in deregulated power markets’. Proc. IEEE Power Eng. Society Summer Meeting, Washington, USA, July 2000, vol. 4, pp. 2272–2277.
-
-
13)
-
29. Zani, A., Migliavacca, G., Grassi, A.: ‘A scenario analysis for an additional RES integration into the European transmission grid up to 2050’. Proc. Eighth Int. Conf. on European Energy Market, Zagreb, Croatia, May 2011.
-
-
14)
-
30. European Climate Foundation: ‘Roadmap 2050: practical guide to a prosperous, low carbon Europe’. Available at https://www.roadmap 2050.eu, 2010.
-
-
15)
-
16. EIRGRID: ‘Interconnection economic feasibility report’. Available at http://www.eirgrid.com, 2009.
-
-
16)
-
32. Ejebe, G.C., Tong, J., Waight, J.G., Frame, J.G., Wang, X., Tinney, W.F.: ‘Available transfer capability calculations’, IEEE Trans. Power Syst., 1998, 13, (4), pp. 1521–1527.
-
-
17)
-
33. Holttinen, H., Meibom, P., Orths, A., et al: ‘Design and operation of power systems with large amounts of wind power’. Final report IEA Wind Task 25, 2009.
-
-
18)
-
7. Rivier, J.: ‘Electricity market participation of wind farms: the success story of the Spanish pragmatism’, Energy Policy, 2010, 38, (7), pp. 3174–3179.
-
-
19)
-
27. Union for the Coordination of the Transmission of Electricity (UCTE), ‘Load-frequency control and performance’, Operation Handbook, v2.5. Available at https://www.entsoe.eu/resources/publications/system-operations/operation-handbook/, June 2004.
-
-
20)
-
17. Moreno, R., Vasilakos, C., Castro, M., Pudjianto, D., Strbac, G.: ‘Impact of wind generation intermittency on transmission expansion models’. CIGRE/IEEE PES Joint Symp., Calgary, Canada, July 2009.
-
-
21)
-
6. Monti M.: ‘Interconnection France-Spain’. (In Spanish). Available at http://www.ec.europa.eu/spain/barcelona/images/documents/notes_de_premsa/rapportmonti-es.pdf, 2008.
-
-
22)
-
13. Bell, K., Ault, G., McDonald, J.: ‘All eyes on wind’, IET Power Eng., 2006, 20, (3), pp. 30–33.
-
-
23)
-
10. Red Eléctrica de España: ‘Limits to the integration of renewable energy generation in the electric system’. (In Spanish). Available at http://www.ree.es/transporte/doc/accesos/Integracion_REE_vertidos_11nov11.pdf, 2011.
-
-
24)
-
3. Ministry of Industry, Tourism and Trade: ‘Renewable Energies Plan 2011–2020’. (In Spanish). Available at http://www.idae.es, 2010.
-
-
25)
-
11. European Climate Foundation: ‘Power perspectives 2030: on the road to a decarbonized power sector’. Available at http://www.roadmap2050.eu/pp2030, 2011.
-
-
26)
-
2. European Commission: ‘A roadmap for moving to a competitive low carbon economy in 2050 – Impact assessment’. Available at http://www.eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=SEC:2011:0288:FIN:EN:PDF, 2011.
-
-
27)
-
22. Rede Eléctrica Nacional: ‘Characterization of the National Transmission Network’. (In Portuguese). Available at http://www.ren.pt, 2011.
-
-
28)
-
12. Billington, R., Statish, J.: ‘Adequacy evaluation in generation, transmission and distribution systems of an electric power system’. WESCANEX 93, IEEE Conf. on Communications, Computers and Power in the Modern Environment, Saskatoon, Canada, May 1993.
-
-
29)
-
24. Fernandes, C., Frías, P., Latorre, J.M.: ‘Impact of vehicle-to-grid on power system operation costs: the Spanish case study’, Appl. Energy, 2012, 96, pp. 194–202.
-
-
30)
-
1. European Commission: ‘Directive of the European Parliament and of the Council on the promotion of the use of energy from renewable sources’. Available at http://www.ec.europa.eu/energy/index_en.htm, 2008.
-
-
31)
-
20. Réseau de transport d’électricité: ‘2010 Reliability Report’. Available at http://www.clients.rte-france.com/htm/an/mediatheque/telecharge/system_reliability_report_2010.pdf, 2010.
-
-
32)
-
14. Sauma, E., Oren, S.: ‘Economic criteria for planning transmission investment in restructured electricity markets’, IEEE Trans. Power Syst., 2007, 22, (4), pp. 1394–1405.
-
-
33)
-
9. Fink, S., Mudd, C., Porter, K., Morgenstern, B.: ‘Wind energy curtailment case studies May 2008–2009’. Report NREL/SR-550-46716, 2009.
-
-
34)
- ENTSO-E: ‘Ten-Year Network Development Plan 2010–2020’. Available at http://www.entsoe.eu.
-
35)
- European Climate Foundation: ‘Power perspectives 2030: on the road to a decarbonized power sector’. Available at http://www.roadmap2050.eu/pp2030.
-
36)
- E.VALUE: ‘New energy technologies: roadmap Portugal 2050’. (In Portuguese). Available at http://www.evalue.pt.
-
37)
- Red Eléctrica de España: ‘Limits to the integration of renewable energy generation in the electric system’. (In Spanish). Available at http://www.ree.es/transporte/doc/accesos/Integracion_REE_vertidos_11nov11.pdf.
-
38)
- Holttinen, H., Meibom, P., Orths, A.: `Design and operation of power systems with large amounts of wind power', Final report IEA Wind Task 25, 2009.
-
39)
- K. Bell , G. Ault , J. McDonald . All eyes on wind. IET Power Eng. , 3 , 30 - 33
-
40)
- Migliavacca, G., L'Abbate, A., Losa, I., Carlini, E.M., Sallati, A., Vergine, C.: `The REALISEGRID cost-benefit methodology to rank pan-European infrastructure investments', Proc. IEEE PES PowerTech, June 2011, Trondheim, Norway.
-
41)
- Ventosa, M., Rivier, M., Ramos, A., García-Alcade, A.: `An MCP approach for hydrothermal coordination in deregulated power markets', Proc. IEEE Power Eng. Society Summer Meeting, July 2000, Washington, USA, 4, p. 2272–2277.
-
42)
- E. Sauma , S. Oren . Economic criteria for planning transmission investment in restructured electricity markets. IEEE Trans. Power Syst. , 4 , 1394 - 1405
-
43)
- P. Frías , C. Fernandes , R. Cossent , L. Olmos . (2010) Report from the regional study case: South-Western Europe (Spain).
-
44)
- Union for the Coordination of the Transmission of Electricity (UCTE), ‘Load-frequency control and performance’, Operation Handbook, v2.5. Available at https://www.entsoe.eu/resources/publications/system-operations/operation-handbook/.
-
45)
- European Commission: ‘Directive of the European Parliament and of the Council on the promotion of the use of energy from renewable sources’. Available at http://www.ec.europa.eu/energy/index_en.htm.
-
46)
- European Commission: ‘A roadmap for moving to a competitive low carbon economy in 2050 – Impact assessment’. Available at http://www.eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=SEC:2011:0288:FIN:EN:PDF.
-
47)
- Monti M.: ‘Interconnection France-Spain’. (In Spanish). Available at http://www.ec.europa.eu/spain/barcelona/images/documents/notes_de_premsa/rapportmonti-es.pdf.
-
48)
- Ministry of Industry, Tourism and Trade: ‘Renewable Energies Plan 2011–2020’. (In Spanish). Available at http://www.idae.es.
-
49)
- Eurelectric: ‘Flexible generation: backing up renewables’. Available at http://www.eurelectric.org.
-
50)
- J. Rivier . Electricity market participation of wind farms: the success story of the Spanish pragmatism. Energy Policy , 7 , 3174 - 3179
-
51)
- EIRGRID: ‘Interconnection economic feasibility report’. Available at http://www.eirgrid.com.
-
52)
- Ramos, A., Latorre, J.M., Báñez, F.: `Modelling the operation of electric vehicles in an operation planning model', Proc. 17th Power Syst. Computation Conf. (PSCC), August 2011, Stockholm, Sweden.
-
53)
- Moreno, R., Vasilakos, C., Castro, M., Pudjianto, D., Strbac, G.: `Impact of wind generation intermittency on transmission expansion models', CIGRE/IEEE PES Joint Symp., July 2009, Calgary, Canada.
-
54)
- Red Eléctrica de España: ‘The Spanish Electricity System 2010’. Available at http://www.ree.es/ingles/home.asp.
-
55)
- G.C. Ejebe , J. Tong , J.G. Waight , J.G. Frame , X. Wang , W.F. Tinney . Available transfer capability calculations. IEEE Trans. Power Syst. , 4 , 1521 - 1527
-
56)
- Billington, R., Statish, J.: `Adequacy evaluation in generation, transmission and distribution systems of an electric power system', WESCANEX 93, IEEE Conf. on Communications, Computers and Power in the Modern Environment, May 1993, Saskatoon, Canada.
-
57)
- Réseau de transport d’électricité: ‘2010 Reliability Report’. Available at http://www.clients.rte-france.com/htm/an/mediatheque/telecharge/system_reliability_report_2010.pdf.
-
58)
- European Climate Foundation: ‘Roadmap 2050: practical guide to a prosperous, low carbon Europe’. Available at https://www.roadmap 2050.eu.
-
59)
- K. Dietrich , J.M. Latorre , L. Olmos , A. Ramos . Demand response in an isolated system with high wind integration. IEEE Trans. Power Syst. , 1 , 20 - 29
-
60)
- C. Fernandes , P. Frías , J.M. Latorre . Impact of vehicle-to-grid on power system operation costs: the Spanish case study. Appl. Energy , 194 - 202
-
61)
- Rede Eléctrica Nacional: ‘Characterization of the National Transmission Network’. (In Portuguese). Available at http://www.ren.pt.
-
62)
- Fernandes, C., Frías, P.: `Impact of intermittent generation on the expansion of the Spanish power system interconnection capacity', IEEE PES PowerTech, June 2011, Trondheim, Norway.
-
63)
- Zani, A., Migliavacca, G., Grassi, A.: `A scenario analysis for an additional RES integration into the European transmission grid up to 2050', Proc. Eighth Int. Conf. on European Energy Market, May 2011, Zagreb, Croatia.
-
64)
- G.W. Ault , K.R.W. Bell , S.J. Galloway . Calculation of economic transmission connection capacity for wind power generation. IET Renew. Power Gener. , 61 - 69
-
65)
- Fink, S., Mudd, C., Porter, K., Morgenstern, B.: `Wind energy curtailment case studies May 2008–2009', Report NREL/SR-550-46716, 2009.
-
66)
- Ministry of Economy, Innovation and Development: ‘New Energies Plan: ENE 2020’. (In Portuguese). Available at http://www.renewable.pt.
-
1)