Operating reserve capacity requirements and pricing in deregulated markets using probabilistic techniques

Operating reserve capacity requirements and pricing in deregulated markets using probabilistic techniques

For access to this article, please select a purchase option:

Buy article PDF
$19.95
(plus tax if applicable)
Buy Knowledge Pack
10 articles for $120.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

A new probabilistic methodology to evaluate the operating reserve requirements of power systems in deregulated energy markets is presented. The main objectives are the assessment of reserve requirements for all submarkets (i.e. regulation, spinning, non-spinning and replacement), and the determination of the maximum acceptable bid prices in these submarkets and eliminating possible speculations. In order to balance reliability and costs, the proposed methodology is based on merging the loss of load cost index into the capacity bidding process for all operating reserve submarkets, thus avoiding the a priori establishment of an arbitrary risk index as a reference criterion. The results of studies using different test systems, including the IEEE-reliability test system and a configuration of the Brazilian South–Southeastern system, are presented and discussed.

References

    1. 1)
      • R.N. Allan , A.M. Leite da Silva , A.A. Abu-Nasser , R.C. Burchet . Discrete convolution in power system reliability. IEEE Trans. Reliability , 5 , 452 - 456
    2. 2)
    3. 3)
    4. 4)
      • R. Billinton , N.A. Chowdhury . Operating reserve assessment in interconnected generating system. IEEE Trans. Power Syst. , 4 , 1479 - 1487
    5. 5)
    6. 6)
    7. 7)
      • L.T. Anstine , R.E. Burke , J.E. Casey , R. Holgate , R.S. John , H.G. Stewart . Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection. IEEE Trans. PAS , 726 - 735
    8. 8)
      • CIGRÉ Task Force 38-05-07, ‘Methods and tools for costing ancillary services“, SC 38, Advisory Group 05, 2000.
    9. 9)
    10. 10)
      • A.M. Leite da Silva , A.C.G. Melo , S.H. Cunha . Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems. IEE Proc. Gener. Transm. Distrib. , 1 , 94 - 102
    11. 11)
      • IEEE reliability test system. IEEE Trans. PAS , 2047 - 2054
    12. 12)
      • A.M. Leite da Silva , G. A. Pérez , J.W. Marangon Lima , J.C.O. Mello . Loss of load costs in generation capacity reliability evaluation. Electric Power Systems Research , 109 - 116
    13. 13)
      • J. Wang , X. Wang , Y. Wu . Operating reserve model in the power market. IEEE Trans. on Power Syst. , 1 , 223 - 229
    14. 14)
      • R. Kamat , S.S. Oren . Rational buyer meets rational seller: reserve market equilibrium under alternative auction designs. Journal of Regulatory Economics , 3 , 247 - 288
    15. 15)
      • R. Billinton , R.N. Allan . (1984) Reliability evaluation of power systems.
    16. 16)
      • A.J. Wood , B.F. Wollenberg . (1996) Power generation, operation and control.
    17. 17)
    18. 18)
      • Liu, Y., Rothleder, M., Alaywan, Z., Assadian, M., Rahimi, F.A.: `Implementing rational buyer's algorithm at California ISO', Proceedings of the IEEE PES Summer Meeting, 2002, New York.
    19. 19)
      • Liu, Y., Alaywan, Z., Rothleder, M., Liu, S., Assadiam, M.: `A rational buyer's algorithm used for ancillary service procurement', Proceedings of the IEEE PES Summer Meeting, 2000, Singapore.
    20. 20)
      • Prada, R.B., Velasco, C.J., Da Silva, L.X., Melo, A.C.G.: `Provision of generation reserves as an ancillary service in the Brazilian system', Proceedings of the 14th PSCC, Sevilla, 2002, session 43, p. 1–7.
    21. 21)
      • M.E. Khan , R. Billinton . Composite spinning reserve assessment in interconnected system. IEE Proc. Gener., Transm. Distrib. , 3 , 305 - 309
    22. 22)
      • Rachidi-Nejad, M., Song, Y.H., Javidi-Dasht-Bayaz, M.H.: `Operating reserve provision in deregulated power markets', Proceedings of the IEEE PES Winter Meeting, 2002, NY, USA, p. 1305–1310, 2.
    23. 23)
    24. 24)
      • Oren, S.S.: `Design of ancillary services markets', Proceedings of the 34th Hawaii International Conference on Systems Sciences, 2001, Hawaii.
    25. 25)
      • Marangon, J.W., Leite da Silva, A.M.: `Spinning reserve requirements in a competitive environment', Proceedings of the 5th International Conference on PMAPS - probability methods applied to power systems, 1997, Vancouver, BC, Canada, p. 431–438.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd_20060191
Loading

Related content

content/journals/10.1049/iet-gtd_20060191
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address