© The Institution of Engineering and Technology
The increasing penetration of wind turbine generators (WTGs) into power systems can affect many network operational aspects such as stability and power quality. The accurate, validated representation of these generators and their components for studying particular operational events, such as cut-in and soft-starting, short-circuit faults and generator switching, remains a challenge. Accurate simulation is particularly important for investigating stability interactions within weak grids or localised networks (e.g. micro-grids or islanded networks). One of the events producing major transient interaction between a WTG and a local grid is the grid connection itself. A simulation model of the use of a soft-starter during the grid connection of a wind turbine equipped with a squirrel cage induction generator and thyristor-based soft-start module is presented. This model has been validated using experimental measurements taken from a wind turbine generator in an operational wind farm site. The analysis focuses on verifying the transients produced during the short-time after the connection to the local grid. Existing literature presents insufficient details about this particular process as well as the practical performance of the soft-starter. It is further demonstrated that ambiguities in this subject may lead to mistaken conclusions in technical assessments carried out by wind farm operators and Distribution Network Operators (DNOs).
References
-
-
1)
-
S.K. Salman ,
A.L.J. Teo
.
Windmill modeling consideration and factors influencing the stability of a grid-connected wind power-based embedded generator.
IEEE Trans. Power Syst.
,
2 ,
793 -
802
-
2)
-
T. Burton ,
D. Sharpe ,
N. Jenkins
.
(2001)
Wind energy handbook.
-
3)
-
Quinonez-Varela, G., Cruden, A., Grant, A.: `Electrical integration of wind turbines into industrial power systems: the case of a mining unit', Proc. IEEE Porto Powertech 2001, 10–13 September 2001, Porto, Portugal.
-
4)
-
Tande, J.O., Muljadi, E., Carlson, O.: `Dynamic models of wind farms for power system studies – status by IEA wind R&D annex 21', Proc. European Wind Energy Conf., EWEC'04, 22–25 November 2004, London, UK.
-
5)
-
J.G. Slootweg ,
H. Polinder ,
W.L. Kling
.
Representing wind turbine electrical generating systems in fundamental frequency simulations.
IEEE Trans. Energy Convers.
,
4 ,
516 -
524
-
6)
-
R. Chedid ,
N. LaWhite ,
M. Ilic
.
A comparative analysis of dynamic models for performance calculations of grid-connected wind turbine generators.
Wind Eng.
,
4 ,
168 -
182
-
7)
-
T. Thringer
.
Grid-friendly connecting of constant-speed wind turbines using external resistors.
IEEE Trans. Energy Convers.
,
4 ,
537 -
542
-
8)
-
V. Akhmatov ,
H. Knudsen ,
A.H. Nielsen ,
J.K. Pedersen ,
N.K. Poulsen
.
Modelling and transient stability of large wind farms.
Int. J. Electr. Power Energy Syst.
,
123 -
144
-
9)
-
Slootweg, J.G., Kling, W.L.: `Aggregated modelling of wind parks in power system dynamics simulations', Proc. 2003 IEEE Bologna Power Tech Conf., 23–26 June 2003, Bologna, Italy, p. 626–631.
-
10)
-
(2003)
Dynamic models of wind farms for power system studies.
-
11)
-
Iov, F., Hansen, A.D., Blaabjerg, F., Teodorescu, R.: `Modelling of soft-starters for wind turbine applications', Proc. PCIM'2003, Power Quality, 20–22 May 2003, Nuremberg, Germany, p. 179–184.
-
12)
-
P. Sørensen ,
A. Hansen ,
L. Janosi ,
J. Bech ,
B. Bak-Jensen
.
(2001)
Simulation of interaction between wind farm and power system.
-
13)
-
J.K. Pederson ,
K.O. Helgelsen-Pederson ,
N. Kjølstad Poulsen
.
Contribution to a dynamic wind turbine model validation from a wind farm islanding experiment.
Electr. Power Syst. Res.
,
1 ,
41 -
51
-
14)
-
T. Petru ,
T. Thiringer
.
Modelling of wind turbines for power system studies.
IEEE Trans. Energy Convers.
,
4 ,
1132 -
1139
-
15)
-
BWEA: Operational Wind Farms. http://www.bwea.com/ukwed/operational.asp, 20 November 2005.
-
16)
-
PSCAD/EMTDC Theory Manual, Version 3, Manitoba HVDC Research Centre, 1998.
-
17)
-
W.E. Leithead ,
B. Connor
.
Control of variable speed wind turbines: dynamic models.
Int. J. Control
,
13 ,
1173 -
1188
-
18)
-
V. Akhmatov ,
H. Knudsen ,
A.H. Nielsen
.
Advanced simulation of windmills in the electric power supply.
Int. J. Electr. Power Energy Syst.
,
421 -
434
-
19)
-
SP Transmission and Distribution: ‘Distribution: Long Term Development Statement for SP Distribution PLC for the Years 2002/03 to 2006/07', November 2002.
-
20)
-
J. Wilkie ,
W.E. Leithead ,
C. Anderson
.
Modelling of wind turbines by simple models.
Wind Eng.
,
4 ,
247 -
274
-
21)
-
Bonus Energy A/S. Bonus 600 kW: The Wind Turbine Components and Operation, 1999.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd_20060180
Related content
content/journals/10.1049/iet-gtd_20060180
pub_keyword,iet_inspecKeyword,pub_concept
6
6