http://iet.metastore.ingenta.com
1887

Locating minimum number of PMUs for pre- and post-disturbance monitoring of power systems

Locating minimum number of PMUs for pre- and post-disturbance monitoring of power systems

For access to this article, please select a purchase option:

Buy eFirst article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

In this study, the post-disturbance coherency of buses is added to the conventional phasor measurement unit (PMU) placement problem to find the minimum number of PMUs at different depths of unobservability. To do that, different scenarios are defined based on probabilistic parameters. Then, in each scenario, central buses are determined based on the similarity of post-disturbance variations using subtractive clustering algorithm. The central bus in each area is the bus that its post-disturbance variations are similar to the highest number of buses in the area. The PMU placement problem is then solved considering the number of scenarios where each bus has been selected as a central bus. The resulted placement scheme is more suitable for monitoring the power system dynamics compared to the conventional method. In order to reduce the number of PMUs, the placement problem is solved for higher depths of unobservability. In each depth, the voltage phasor of unobservable buses is obtained using state estimation methods. The results of applying the proposed methodology on 68-bus, 16-machine system show its better performance compared to the conventional method.

http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2018.6404
Loading

Related content

content/journals/10.1049/iet-gtd.2018.6404
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address