System state model based multi-period robust generation, transmission, and demand side resource co-optimisation planning

System state model based multi-period robust generation, transmission, and demand side resource co-optimisation planning

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

This study discusses a multi-period co-optimised generation and transmission expansion planning (GTEP) problem while considering a proliferation of demand side resources (DSR). Uncertain renewable energy variations and load fluctuations in the long-term planning horizon are addressed, and a system state model derived via k-means clustering algorithm is adopted to capture temporal operation features. The problem is formulated as a two-stage robust optimisation model with mixed-integer recourse, in which annual investment decisions of generation, transmission, and DSR assets are determined in the first stage and short-term operation decisions of individual system states are made in the second stage. In recognising that considering DSR deployment and the system state model brings significant computational complexity, an extended column-and-constraint-generation algorithm is adopted to effectively solve the proposed planning problem. Numerical studies show that integrating DSRs into multi-period GTEP could effectively postpone or even avoid expensive generation/transmission investment in the planning stage, and improve economic efficiency in the operation stage.

http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2018.5936
Loading

Related content

content/journals/10.1049/iet-gtd.2018.5936
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address