Expectation–maximisation model for stochastic distribution network planning considering network loss and voltage deviation

Expectation–maximisation model for stochastic distribution network planning considering network loss and voltage deviation

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

The penetration of wind power is increasing in distribution network for reducing reliance on fossil fuels and covering continuously increasing demand for energy. However, it is argued that the forecasting error of wind power cannot be avoided even using the best forecasting approach. Therefore, in this study, a mean-variance-skewness based expectation maximisation (MVSbEM) model has been proposed by maximisation of the mean and skewness while simultaneously minimisation of the variance to obtain the optimal trade-off relationship between the profit and risk of distribution network planning (DNP) considering uncertain wind power integrated. In the MVSbEM model, the indexes of network loss, voltage deviation, and investment cost are concurrently taken into account under several kinds of actual operation constraints. In addition, the authors have made a full investigation on the MVSbEM by considering different forecasting errors, power factors of wind power, the different forecasting wind speeds, the number of wind turbines as well as the lines and substations upgrading. Furthermore, in order to reduce the computational burden, the Latin hypercube sampling method is used to sample uncertain wind speed. The feasibility and effectiveness of the MVSbEM model have been comprehensively evaluated on a modified IEEE 33-bus system.

http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2018.5813
Loading

Related content

content/journals/10.1049/iet-gtd.2018.5813
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address