Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

access icon free Capacity certificate, a step forward in the Iranian power market

Based on theoretical studies and practical experiences in power systems, electricity market by itself cannot create an effective condition for optimal investment in generation capacity (GC) expansion. On the other hand, the political, social, and economic consequences of shortage of power generation are inevitable under any condition. Thus, several incentives have been introduced to support investment in GC. Currently, the capacity payment mechanism is used for this purpose in the Iranian power market. In addition, the mechanism, along with its benefits, is suffering from some inadequacies and inefficiencies. The present study aimed to introduce Iranian power market and the specifications of the capacity mechanism used in this market. Accordingly, a new incentive called ‘Capacity Certificate’ which has been adopted for Iranian power market is modelled and analysed, along with explaining its characteristics. Regarding the advantage of system dynamics, the effect of this mechanism on the long-term performance of the power market was evaluated from the perspective of the GC expansion and was compared with the capacity payment mechanism. The results revealed that using the capacity certificate mechanism in Iranian power market can be considered as a step forward toward a better system reserve and lower cost.

References

    1. 1)
      • 31. Ghazizadeh, M.S., Sheikh-El-Eslami, M.K., Seifi, H.: ‘Electricity restructuring [business scene]’, IEEE Power Energy Mag., 2007, 5, (2), pp. 1620.
    2. 2)
      • 3. Zucarato, A.N., da Silva, E.L.: ‘Simulation model to assess the performance of a forward capacity market for hydro-based systems’, IET Gener. Transm. Distrib., 2012, 6, (11), pp. 10861095.
    3. 3)
      • 34. Bigdeli, N., Afshar, K.: ‘Characterization of Iran electricity market indices with pay-as-bid payment mechanism’, Phys. A, Stat. Mech. Appl., 2009, 388, (8), pp. 15771592.
    4. 4)
      • 39. Mollahosseini, A., Hosseini, S.A., Jabbari, M., et al: ‘Renewable energy management and market in Iran: a holistic review on current state and future demands’, Renew. Sustain. Energy Rev., 2017, 80, pp. 774788.
    5. 5)
      • 24. Finon, D., Meunier, G., Pignon, V.: ‘The social efficiency of long-term capacity reserve mechanisms’, Util. Policy, 2008, 16, (3), pp. 202214.
    6. 6)
      • 32. Khosroshahi, K.A., Jadid, S., Shahidehpour, M.: ‘Electric power restructuring in Iran: achievements and challenges’, Electr. J., 2009, 22, (2), pp. 7483.
    7. 7)
      • 15. Galetovic, A., Muñoz, C.M., Wolak, F.A.: ‘Capacity payments in a cost-based wholesale electricity market: the case of Chile’, Electr. J., 2015, 28, (10), pp. 8096.
    8. 8)
      • 36. Hasani-Marzooni, M., Hosseini, S.H.: ‘Dynamic analysis of various investment incentives and regional capacity assignment in Iranian electricity market’, Energy. Policy., 2013, 56, pp. 271284.
    9. 9)
      • 6. Kamalinia, S., Shahidehpour, M.: ‘Capacity adequacy calculation by considering locational capacity prices’, IET Gener. Transm. Distrib., 2010, 4, (3), pp. 376385.
    10. 10)
      • 22. Sioshansi, F.P.: ‘Competitive electricity markets: design, implementation, performance’ (Elsevier, USA, 2011).
    11. 11)
      • 29. ‘Iran Power Generation, Transmission and Distribution Management Company (TAVANIR)’. Available at http://www.tavanir.org.ir.
    12. 12)
      • 26. Orme, B.: ‘Incapacitated: why the capacity market for electricity generation is not working, and how to reform it’, London Inst. Public Policy Res., (Institute for Public Policy Research, UK, 2016).
    13. 13)
      • 12. Park, J.-Y., Ahn, N.-S., Yoon, Y.-B., et al: ‘Investment incentives in the Korean electricity market’, Energy. Policy., 2007, 35, (11), pp. 58195828.
    14. 14)
      • 37. Yousefi, G.R., Kaviri, S.M., Latify, M.A., et al: ‘Electricity industry restructuring in Iran’, Energy. Policy., 2017, 108, pp. 212226.
    15. 15)
      • 2. Sener, A.C.: ‘A hybrid resource adequacy compensation mechanism’, Electr. J., 2013, 26, (9), pp. 3641.
    16. 16)
      • 44. Teufel, F., Miller, M., Genoese, M., et al: ‘Review of system dynamics models for electricity market simulations’ (KIT Scientific Publishing, Germany, 2013).
    17. 17)
      • 30. ‘Ministry of Energy, I. R. of Iran, Instructions on Capacity Certificate Transactions’, No. 95/40749/20/100, 19 December 2016.
    18. 18)
      • 17. Gelmini, A., Benini, M., Gallanti, M., et al: ‘A capacity payment model for the Italian electricity market why it is needed and how can it be designed?’. Market Design Conference: Incentives to Build New Generation on Competetive Electricity Markets, Stockholm, Sweden, June 2007, pp. 115.
    19. 19)
      • 5. Conejo, A.J., Baringo, L., Kazempour, S.J., et al: ‘Investment in electricity generation and transmission’ (Springer International Publishing, Switzerland, 2016).
    20. 20)
      • 42. Olsina, F., Garces, F., Haubrich, H.-J.: ‘Modeling long-term dynamics of electricity markets’, Energy. Policy., 2006, 34, (12), pp. 14111433.
    21. 21)
      • 43. Assili, M., H, M., Javidi, D.B., et al: ‘An improved mechanism for capacity payment based on system dynamics modeling for investment planning in competitive electricity environment’, Energy. Policy., 2008, 36, (10), pp. 37033713.
    22. 22)
      • 23. Finon, D., Pignon, V.: ‘Electricity and long-term capacity adequacy: the quest for regulatory mechanism compatible with electricity market’, Util. Policy, 2008, 16, (3), pp. 143158.
    23. 23)
      • 20. Rodilla, P., Batlle, C., Salazar, J., et al: ‘Modeling generation expansion in the context of a security of supply mechanism based on long-term auctions. Application to the Colombian case’, Energy Policy, 2011, 39, (1), pp. 176186.
    24. 24)
      • 28. Hancher, L., de Houteclocque, A., Sadowska, M.: ‘Capacity mechanisms in the EU energy market: law, policy, and economics’ (Oxford University Press, USA, 2015).
    25. 25)
      • 11. Batlle, C., Pérez-Arriaga, I.J.: ‘Design criteria for implementing a capacity mechanism in deregulated electricity markets’, Util. Policy, 2008, 16, (3), pp. 184193.
    26. 26)
      • 1. Briggs, R.J., Kleit, A.: ‘Resource adequacy reliability and the impacts of capacity subsidies in competitive electricity markets’, Energy Econ., 2013, 40, pp. 297305.
    27. 27)
      • 13. Joskow, P.L.: ‘Capacity payments in imperfect electricity markets: need and design’, Util. Policy, 2008, 16, (3), pp. 159170.
    28. 28)
      • 4. Rodilla, P., Batlle, C.: ‘Security of electricity supply at the generation level: problem analysis’, Energy Policy, 2012, 40, pp. 177185.
    29. 29)
      • 7. Cramton, P., Stoft, S.: ‘A capacity market that makes sense’, Electr. J., 2005, 18, (7), pp. 4354.
    30. 30)
      • 27. Brown, D.: ‘Capacity market design: motivation and challenges in Alberta's electricity market’, 2018.
    31. 31)
      • 8. Cramton, P., Ockenfels, A., Stoft, S., et al: ‘Capacity market fundamentals’, Econ. Energy Environ. Policy, 2013, 2, (2), pp. 2746.
    32. 32)
      • 33. Bigdeli, N., Afshar, K., Amjady, N.: ‘Market data analysis and short-term price forecasting in the Iran electricity market with pay-as-bid payment mechanism’, Electr. Power Syst. Res., 2009, 79, (6), pp. 888898.
    33. 33)
      • 16. Hawker, G., Bell, K., Gill, S.: ‘Electricity security in the European Union – the conflict between national capacity mechanisms and the single market’, Energy Res. Soc. Sci., 2017, 24, pp. 5158.
    34. 34)
      • 25. Gore, O., Vanadzina, E., Viljainen, S.: ‘Linking the energy-only market and the energy-plus-capacity market’, Util. Policy, 2016, 38, pp. 5261.
    35. 35)
      • 35. Asgari, M.H., Monsef, H.: ‘Market power analysis for the Iranian electricity market’, Energy. Policy., 2010, 38, (10), pp. 55825599.
    36. 36)
      • 14. Barrionuevo, L.J., Rubio-Barros, R.G.: ‘The regulatory reforms in the Argentine wholesale electricity market: present situation-2015’. 2016 IEEE PES Transmission & Distribution Conf. and Exposition-Latin America (PES T&D-LA), Morelia, Mexico, September 2016, pp. 16.
    37. 37)
      • 21. Hobbs, B.F., Hu, M.-C., Iñón, J.G., et al: ‘A dynamic analysis of a demand curve-based capacity market proposal: the PJM reliability pricing model’, IEEE Trans. Power Syst., 2007, 22, (1), pp. 314.
    38. 38)
      • 18. Moreno, R., Barroso, L.A., Rudnick, H., et al: ‘Auction approaches of long-term contracts to ensure generation investment in electricity markets: lessons from the Brazilian and Chilean experiences’, Energy Policy, 2010, 38, (10), pp. 57585769.
    39. 39)
      • 41. ‘Iran Grid Management Company (IGMC)’. Available at http://www.igmc.ir.
    40. 40)
      • 40. Zandi, M., Goodarzi, M.: ‘Development of science and technology in the Iranian electric power industry: challenges and future progress’, in Soofi, A., Goodarzi, M. (Eds.): ‘The development of science and technology in Iran’ (Springer, Palgrave Macmillan, USA, 2017), pp. 111131.
    41. 41)
      • 38. Manzoor, D., Aryanpur, V.: ‘Power sector development in Iran: A retrospective optimization approach’, Energy, 2017, 140, pp. 330339.
    42. 42)
      • 9. Joskow, P., Tirole, J.: ‘Reliability and competitive electricity markets’, Rand J. Econ., 2007, 38, (1), pp. 6084.
    43. 43)
      • 10. Pérez-Arriaga, I.J.: ‘Regulation of the power sector’ (Springer Science & Business Media, UK, 2013).
    44. 44)
      • 19. Serra, P.: ‘Contract market power and its impact on the efficiency of the electricity sector’, Energy Policy, 2013, 61, pp. 653662.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2018.5096
Loading

Related content

content/journals/10.1049/iet-gtd.2018.5096
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address