access icon free Risk based multi-objective dynamic expansion planning of sub-transmission network in order to have eco-reliability, environmental friendly network with higher power quality

This study suggests a method based on stochastic multi-objective modelling for optimally timing, siting and sizing of sub-transmission substationsand medium voltage feeders, distributed generations and capacitors, simultaneously, in order to take more pros of recent developed technologies. Regards to comprehensive impact of uncertainties including: intermittent nature of renewable energy sources, load forecasting and market price errors, some strategies must be devised in order to well incorporate them into the problem. The mentioned problem is modelled by dynamic programming which NSGA-2 is chosen for optimisation purposes and then fuzzy set theory is applied to find the best compromise solution. The proposed scheme aims to minimise substations expansion and installation cost, medium voltage feeders installation and replacement cost, DG units installation and operation cost, capacitors installation cost, cost of purchased energy from the transmission network, active and reactive power losses cost, and connection cost of sub-transmission substations to the upstream network. Besides, risk based modelling of energy not-supplied as an efficient reliability index is incorporated to cost function in order to improve the reliability of the network. Also voltage deviation and voltage stability as the criterion of power quality in distribution networks and emission reduction are treated as independent objective functions.

References

    1. 1)
    2. 2)
    3. 3)
    4. 4)
    5. 5)
      • 15. Wang, L., Singh, C.: ‘Reliability-constrained optimum placement of reclosers and distributed generators in distribution networks using an ant colony system algorithm’, IEEE Trans. Appl. Rev., 2008, 38, (6), pp. 757764.
    6. 6)
    7. 7)
    8. 8)
      • 29. Pilo, F., Celli, G., Mocci, S.: ‘Improvement of reliability in active networks with intentional islanding’. DRPT Conf., 2004, Honk Kong, 5–8 April 2004, pp. 474479. Paper 117.
    9. 9)
      • 24. Soroudi, A., Mohammadi-Ivatloo, B., Rabiee, A.: ‘Energy hub management with intermittent wind power’, In: Hossain, J., Mahmid, A. (Eds.) ‘Large scale renewable power generation, green energy and technology’ (Springer, Singapore, 2014), pp. 413438.
    10. 10)
    11. 11)
      • 1. Gonen, T.: ‘Electric power distribution system engineering’ (McGraw-Hill, 1986).
    12. 12)
    13. 13)
    14. 14)
    15. 15)
    16. 16)
    17. 17)
    18. 18)
    19. 19)
    20. 20)
    21. 21)
    22. 22)
    23. 23)
    24. 24)
    25. 25)
    26. 26)
    27. 27)
    28. 28)
    29. 29)
    30. 30)
    31. 31)
    32. 32)
      • 17. Brown, R.E., Pan, J., Feng, X., et al: ‘Sitting distributed generation to defer T&D expansion’. Proc. of IEEE Transmission and Distribution Conf. and Exposition, Atlanta (USA), 2001, vol. 2, pp. 622627.
    33. 33)
    34. 34)
    35. 35)
    36. 36)
      • 6. Willis, H.L.: ‘Power distribution planning reference book’ (Marcel Dekker, New York, 2004, 2nd edn.).
    37. 37)
      • 5. Hongwei, D., Yixin, Y., Chunhua, H., et al: ‘Optimal planning of distribution substation locations and sizes – model and algorithm’, Electr. Power Energy Syst., 1996, 18, (2), pp. 343357.
    38. 38)
    39. 39)
    40. 40)
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2016.0952
Loading

Related content

content/journals/10.1049/iet-gtd.2016.0952
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address