© The Institution of Engineering and Technology
Available transfer capability (ATC) provides important information for power marketers and planning sectors in restructured power systems. The stochastic nature of power system behaviour, however, made ATC determination a difficult and complicated task. A stochastic framework has been established for ATC calculation with implication of uncertainties in transmission failures, hourly peak loads and system cascading collapse. The proposed ATC calculation framework is based on parametric bootstrap technique which enables generating random samples of system operating condition with uncertainty at a predefined confidence interval. The IEEE RTS-96 network is employed to demonstrate the effectiveness of the proposed framework. The results presented indicate the significant impact of uncertainties on ATC value.
References
-
-
1)
-
4. Ou, Y., Singh, C.: ‘Calculation of risk and statistical indices associated with available transfer capability’, IEE Proc. Gener. Transm. Distrib., 2003, 150, (2), pp. 239–244 (doi: 10.1049/ip-gtd:20030024).
-
2)
-
25. Mili, Q.Q.L., Phadke, A.G.: ‘Risk assessment of catastrophic failures in electric power systems’, Int. J. Crit. Infrastruct., 2004, 1, pp. 38–63 (doi: 10.1504/IJCIS.2004.003795).
-
3)
-
13. Othman, M.M., Mohamed, A., Hussain, A.: ‘Determination of transmission reliability margin using parametric bootstrap technique’, IEEE Trans. Power Syst., 2008, 23, (4), pp. 1689–1700 (doi: 10.1109/TPWRS.2008.2004734).
-
4)
-
16. ‘India blackouts leave 700 million without power’, .
-
5)
-
G. Andersson ,
P. Donalek ,
R. Farmer
.
Causes of the 2003 major grid blackouts in North America and Europe, and recommended means to improve system dynamic performance.
IEEE Trans. Power Syst.
,
4 ,
1922 -
1928
-
6)
-
17. U. S.-C. P. S. O. T. Force: ‘Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations’, 2004.
-
7)
-
The IEEE Reliability Test System-1996.
IEEE Trans. Power Syst.
,
3 ,
1010 -
1020
-
8)
-
C.L. Su ,
C.N. Lu
.
Two-point estimate method for quantifying transfer capability uncertainty.
IEEE Trans. Power Syst.
,
2 ,
573 -
579
-
9)
-
14. Bakshi, A.S., Velayutham, A., Srivastava, S.C.: ‘Report of the Enquiry Committee on Grid Disturbance in Northern Region on 30th July 2012 and in Northern, Eastern & North-Eastern Region on 31st July 2012’, 2012.
-
10)
-
10. Xiao, Y., Song, Y.H.: ‘Available transfer capability (ATC) evaluation by stochastic programming’, IEEE Power Eng. Rev., 2000, 20, (9), pp. 50–52 (doi: 10.1109/39.866873).
-
11)
-
J.C.O. Mello ,
A.C.G. Melo ,
S. Granville
.
Simultaneous transfer capability assessment by combining interior point methods and Monte Carlo simulation.
IEEE Trans. Power Syst.
,
2 ,
736 -
742
-
12)
-
9. Rodrigues, A.B., Da Silva, M.G.: ‘Probabilistic assessment of available transfer capability based on Monte Carlo method with sequential simulation’, IEEE Trans. Power Syst., 2007, 22, (1), pp. 484–492 (doi: 10.1109/TPWRS.2006.887958).
-
13)
-
1. Weixing, L., Peng, W., Zhizhong, G.: ‘Determination of optimal total transfer capability using a probabilistic approach’, IEEE Trans. Power Syst., 2006, 21, pp. 862–868 (doi: 10.1109/TPWRS.2006.873106).
-
14)
-
F. Xia ,
A.P. Sakis Meliopoulos
.
A methodology for probabilistic simultaneous transfer capability analysis.
IEEE Trans. Power Syst.
,
3 ,
1269 -
1278
-
15)
-
18. ‘Report of the Committee on Grid Disturbance in Northern Region on 30th July 2012 and in Northern, Eastern & North-Eastern Region on 31st July 2012’, .
-
16)
-
12. Othman, M.M., Musirin, I.: ‘A novel approach to determine transmission reliability margin using parametric bootstrap technique’, Electr. Power Energy Syst., 2011, 33, pp. 1666–1675 (doi: 10.1016/j.ijepes.2011.08.003).
-
17)
-
15. FERC and NERC: ‘Arizona-Southern California Outages on September 8, 2011. Causes and Recommendations’, 2012.
-
18)
-
6. Stahlhut, J.W., Heydt, G.T.: ‘Stochastic-algebraic calculation of available transfer capability’, IEEE Trans. Power Syst., 2007, 22, (2), pp. 616–623 (doi: 10.1109/TPWRS.2007.894865).
-
19)
-
Y. Ou ,
C. Singh
.
Assessment of available transfer capability and margins.
IEEE Trans. Power Syst.
,
2 ,
463 -
468
-
20)
-
11. Xiao, Y., Song, Y.H., Sun, Y.Z.: ‘A hybrid stochastic approach to available transfer capability evaluation’, IEE Proc. Gener. Transm. Distrib., 2001, 148, (5), pp. 420–426 (doi: 10.1049/ip-gtd:20010478).
-
21)
-
18. ‘Report of the Committee on Grid Disturbance in Northern Region on 30th July 2012 and in Northern, Eastern & North-Eastern Region on 31st July 2012’, .
-
22)
-
12. Othman, M.M., Musirin, I.: ‘A novel approach to determine transmission reliability margin using parametric bootstrap technique’, Electr. Power Energy Syst., 2011, 33, pp. 1666–1675 (doi: 10.1016/j.ijepes.2011.08.003).
-
23)
-
25. Mili, Q.Q.L., Phadke, A.G.: ‘Risk assessment of catastrophic failures in electric power systems’, Int. J. Crit. Infrastruct., 2004, 1, pp. 38–63 (doi: 10.1504/IJCIS.2004.003795).
-
24)
-
14. Bakshi, A.S., Velayutham, A., Srivastava, S.C.: ‘Report of the Enquiry Committee on Grid Disturbance in Northern Region on 30th July 2012 and in Northern, Eastern & North-Eastern Region on 31st July 2012’, 2012.
-
25)
-
19. Salim, N.A., Othman, M.M., Musirin, I., Serwan, M.S.: ‘Risk assessment of cascading collapse considering the effect of hidden failure’. Int. Conf. Power and Energy, Kota Kinabalu, Malaysia, December 2012, pp. 778–783.
-
26)
-
16. ‘India blackouts leave 700 million without power’, .
-
27)
-
1. Weixing, L., Peng, W., Zhizhong, G.: ‘Determination of optimal total transfer capability using a probabilistic approach’, IEEE Trans. Power Syst., 2006, 21, pp. 862–868 (doi: 10.1109/TPWRS.2006.873106).
-
28)
-
15. FERC and NERC: ‘Arizona-Southern California Outages on September 8, 2011. Causes and Recommendations’, 2012.
-
29)
-
6. Stahlhut, J.W., Heydt, G.T.: ‘Stochastic-algebraic calculation of available transfer capability’, IEEE Trans. Power Syst., 2007, 22, (2), pp. 616–623 (doi: 10.1109/TPWRS.2007.894865).
-
30)
-
10. Xiao, Y., Song, Y.H.: ‘Available transfer capability (ATC) evaluation by stochastic programming’, IEEE Power Eng. Rev., 2000, 20, (9), pp. 50–52 (doi: 10.1109/39.866873).
-
31)
-
7. Xia, F., Meliopoulos, A.P.S.: ‘A methodology for probabilistic simultaneous transfer capability analysis’, IEEE Trans. Power Syst., 1996, 11, (3), pp. 1269–1278 (doi: 10.1109/59.535667).
-
32)
-
20. Andersson, G., Donalek, P., Farmer, R.: ‘Causes of the 2003 major grid blackouts in North America and Europe, and recommended means to improve system dynamic performance’, IEEE Trans. Power Syst., 2005, 20, pp. 1922–1928 (doi: 10.1109/TPWRS.2005.857942).
-
33)
-
24. Grigg, C., Wong, P., Albrecht, P.: ‘The IEEE reliability test system-1996. A report prepared by the reliability test system task force of the application of probability methods subcommittee’, IEEE Trans. Power Syst., 1999, 14, pp. 1010–1020 (doi: 10.1109/59.780914).
-
34)
-
8. Mello, J.C.O., Melo, A.C.G., Granville, S.: ‘Simultaneous transfer capability assessment by combining interior point methods and Monte Carlo simulation’, IEEE Trans. Power Syst., 1997, 12, (2), pp. 736–742 (doi: 10.1109/59.589667).
-
35)
-
13. Othman, M.M., Mohamed, A., Hussain, A.: ‘Determination of transmission reliability margin using parametric bootstrap technique’, IEEE Trans. Power Syst., 2008, 23, (4), pp. 1689–1700 (doi: 10.1109/TPWRS.2008.2004734).
-
36)
-
22. Busan, S., Othman, M.M., Musirin, I., Mohamed, A., Hussain, A.: ‘A new algorithm for the available transfer capability determination’. Mathematical Problems in Engineering, 2010, pp. 1–30.
-
37)
-
21. Salim, N.A., Othman, M.M., Musirin, I., Serwan, M.S.: ‘Critical system cascading collapse assessment for determining the sensitive transmission lines and severity of total loading conditions’. Mathematical Problems in Engineering, 2013, pp. 1–10.
-
38)
-
17. U. S.-C. P. S. O. T. Force: ‘Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations’, 2004.
-
39)
-
4. Ou, Y., Singh, C.: ‘Calculation of risk and statistical indices associated with available transfer capability’, IEE Proc. Gener. Transm. Distrib., 2003, 150, (2), pp. 239–244 (doi: 10.1049/ip-gtd:20030024).
-
40)
-
23. Zaini, R.H., Othman, M.M., Musirin, I., Mohamed, A., Hussain, A.: ‘Determination of transmission reliability margin considering uncertainties of system operating condition and transmission line outage’, Eur. Trans. Electr. Power, 2010, 21, (1), pp. 1–18.
-
41)
-
2. Zhang, J., Dobson, I., Alvarado, F.L.: ‘Quantifying transmission reliability margin’, Int. J. Electr. Power Energy Syst., 2004, 26, pp. 697–702.
-
42)
-
9. Rodrigues, A.B., Da Silva, M.G.: ‘Probabilistic assessment of available transfer capability based on Monte Carlo method with sequential simulation’, IEEE Trans. Power Syst., 2007, 22, (1), pp. 484–492 (doi: 10.1109/TPWRS.2006.887958).
-
43)
-
11. Xiao, Y., Song, Y.H., Sun, Y.Z.: ‘A hybrid stochastic approach to available transfer capability evaluation’, IEE Proc. Gener. Transm. Distrib., 2001, 148, (5), pp. 420–426 (doi: 10.1049/ip-gtd:20010478).
-
44)
-
3. Ou, Y., Singh, C.: ‘Assessment of available transfer capability and margins’, IEEE Trans. Power Syst., 2002, 17, (2), pp. 463–468 (doi: 10.1109/TPWRS.2002.1007919).
-
45)
-
5. Chun-Lien, S., Chan-Nan, L.: ‘Two-point estimate method for quantifying transfer capability uncertainty’, IEEE Trans. Power Syst., 2005, 20, (2), pp. 573–579 (doi: 10.1109/TPWRS.2005.846233).
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2013.0395
Related content
content/journals/10.1049/iet-gtd.2013.0395
pub_keyword,iet_inspecKeyword,pub_concept
6
6