Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Renovation strategies and economic regulation in electricity distribution

Renovation strategies and economic regulation in electricity distribution

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Many countries have adopted economic regulation to the electricity distribution. Economic regulation plays a significant role when long-term decisions are determined. The regulatory model sets the framework for the network planning process. It does not give strict instructions for the planning process but aims to ensure the development of the network. This paper elaborates on the influence of the incentive regulation on the electricity distribution and especially on renovation programs, which are among the main functions of the network operators in the coming years. The backgrounds of the electricity distribution network owners are very diverse, which makes the aims of the ownership different. For instance, maximising the return or profit, a strict reliability target or a tight investment schedule may reflect the objectives of the owner. Alternatively, a distribution company owned by a municipality typically wants to provide low-cost electricity for the customers, and to this end, the costs of the company should be minimised. Among others, these objectives have to be taken into account in strategic planning. Traditional distribution network planning that minimises the total costs including capital, operational and interruption costs leads to a different result, compared with planning based on maximising the profit of the owner.

References

    1. 1)
    2. 2)
    3. 3)
      • Lassila, J., Kaipia, T., Voutilainen, V., Koivuranta, K., Haakana, J., Partanen, J.: `Potential of power electronics in electricity distribution systems', Proc. Int. Conf. on SmartGrids for Distribution, CIRED Seminar, 23–24 June 2008, Frankfurt, Germany, p. 1–4.
    4. 4)
      • Sintef Energy Research: ‘Study on estimation of costs due to electricity interruptions and voltage disturbances’. December 2010.
    5. 5)
      • Setréus, J., Wallnerström, C.J., Bertling, L.: `A comparative study of regulation policies for interruption of supply of electrical distribution systems in Sweden and UK', Proc. 19th Int. Conf. and Exhibition on Electricity Distribution, CIRED, 21–24 May 2007, Vienna, Austria, p. 1–4.
    6. 6)
    7. 7)
      • Council of European Energy Regulators: ‘Guidelines of good practice on estimation of costs due to electricity interruptions and voltage disturbances’. December 2010.
    8. 8)
      • Hilber, P., Hällgren, B., Bertling, L.: `Optimizing the replacement of overhead lines in rural distribution systems with respect to reliability and customer value', Proc. 18th Int. Conf. and Exhibition on Electricity Distribution, CIRED, 6–9 June 2005, Turin, Italy, p. 1–5.
    9. 9)
      • Bouford, J., Willis, L.: `Managing aging and sustainable use of T&D infrastructures', IEEE Proc. Power Engineering Society General Meeting, 12–16 June 2005, San Francisco, USA, 3, p. 2608–2609.
    10. 10)
    11. 11)
      • Bengtsson, P., Persson, L., Oberger, K., Hasselström, J.: `Reliability-based planning in rural areas; goals, methods, prioritization, and follow-up at fortum distribution', Proc. 20th Int. Conf. and Exhibition on Electricity Distribution CIRED, 8–11 June 2009, Prague, Czech, p. 1–4.
    12. 12)
      • Honkapuro, S., Partanen, J.: `Analysing the directing signals of the economic regulation', Proc. 20th Int. Conf. and Exhibition on Electricity Distribution CIRED, 8–11 June 2009, Prague, Czech, p. 1–4.
    13. 13)
      • Energy Market Authority of Finland (EMA): ‘Vuoden 2009 aikana kertyneet sähköverkkotoiminnan tuoton yli- ja alijäämät’. (Surplus and deficit of distribution business from year 2009), http://www.energiamarkkinavirasto.fi, accessed 19 December 2011.
    14. 14)
    15. 15)
      • Energy Market Authority of Finland: ‘Sähkön jakeluverkon komponenttien yksikköhinnat vuodelle 2012 (Unit price list of network components for 2012)’ (in Finnish), http://www.energiamarkkinavirasto.fi, accessed 15 December 2011.
    16. 16)
      • Solver, T., Söder, L.: `Comparison of incentives for distribution system reliability in performance-based regulations', Proc. IEEE Second Int. Conf. on Electric Utility Deregulation, Restructuring and Power Technologies, DRPT, 5–8 April 2004, Hong Kong, 2, p. 485–490.
    17. 17)
      • Kjolle, G., Samdal, K., Brekke, K.: `Incorporating short interruptions and time dependency of interruption costs in continuity of supply regulation', Proc. 20th Int. Conf. and Exhibition on Electricity Distribution CIRED, 8–11 June 2009, Prague, Czech, p. 1–4.
    18. 18)
      • Honkapuro, S.: `Performance Benchmarking and incentive regulation – considerations of directing signals for electricity distribution companies', 2008, PhD, Acta Universitatis Lappeenrantaensis 309, Lappeenranta University of Technology, Finland.
    19. 19)
      • Lassila, J.: `Strategic development of electricity distribution networks – concept and methods', 2009, PhD, Acta Universitatis Lappeenrantaensis 371, Lappeenranta University of Technology, Finland.
    20. 20)
      • Energy Market Authority of Finland: ‘Sähkön jakeluverkkotoiminnan ja suunrjännitteisen jakeluverkkotoiminnan hinnoittelun kohtuullisuuden valvontamenetelmien suuntaviivat vuosille 2012–2015’. (Guidelines for assessing reasonableness in pricing of electricity distribution network and high voltage distribution network operations for 2012–2015). Energiamarkkinavirasto, Dnro 945/430/2010. (in Finnish), http://www.energiamarkkinavirasto.fi, accessed 15 December 2011.
    21. 21)
      • Makinen, A., Partanen, J., Lakervi, E.: `Reliability evaluation as part of computer-aided power distribution network design', Proc. IEEE Int. Conf. Symp. on Circuits and Systems, 7–9 Jun 1988, 2, p. 1631–1634.
    22. 22)
      • Haakana, J., Lassila, J., Honkapuro, S., Partanen, J.: `Impacts of renovation: perspectives of the owner and the customer in the electricity distribution business', Proc. Int. Conf. on Sustainable Distribution Asset Management & Financing, CIRED Seminar, 7–8 June 2010, Lyon, France, p. 1–4.
    23. 23)
      • Lassila, J., Kaipia, T., Lohjala, J.: `New investment strategies in the modern electricity distribution business – reliability in the long-term planning', Proc. Power Engineering Society General Meeting, 24–28 June 2007, p. 1–8.
    24. 24)
      • Ghiani, E., Pilo, F., Celli, G., Mocci, S.: `Renewal planning of aged distribution networks', Proc. Int. Conf. on Probabilistic Methods Applied to Power Systems, 25–29 May 2008, Puerto Rico, p. 1–8, Rincón.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2011.0861
Loading

Related content

content/journals/10.1049/iet-gtd.2011.0861
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address