Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

A fast setting method for optimal re-closing time of high voltage transmission line

A fast setting method for optimal re-closing time of high voltage transmission line

For access to this article, please select a purchase option:

Buy conference paper PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
The 16th IET International Conference on AC and DC Power Transmission (ACDC 2020) — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Inspec keywords: power transmission lines; power system faults; stability; power system transient stability; iterative methods

Subjects: Interpolation and function approximation (numerical analysis); Optimisation techniques; Stability in control theory; Power system control; Optimisation techniques; Interpolation and function approximation (numerical analysis); Power transmission lines and cables; Control of electric power systems

Related content

content/conferences/10.1049/icp.2020.0166
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address