Costsaving and reliability improvement by using innovative technique for refurbishment of a substation
Costsaving and reliability improvement by using innovative technique for refurbishment of a substation
- Author(s):
- DOI: 10.1049/cp:20010682
For access to this article, please select a purchase option:
Buy conference paper PDF
Buy Knowledge Pack
IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.
16th International Conference and Exhibition on Electricity Distribution (CIRED 2001) — Recommend this title to your library
Thank you
Your recommendation has been sent to your librarian.
- Author(s): Source: 16th International Conference and Exhibition on Electricity Distribution (CIRED 2001), 2001 page ()
- Conference: 16th International Conference and Exhibition on Electricity Distribution (CIRED 2001)
- DOI: 10.1049/cp:20010682
- ISBN: 0 85296 735 7
- Location: Amsterdam, Netherlands
- Conference date: 18-21 June 2001
- Format: PDF
As a result of availability studies, comparing a traditional substation configuration with conventional equipment and an innovative solution with disconnecting circuit breakers, the latter was found drastically better with regard to power flow. The use of disconnecting circuit breakers also leads to a reduction of the total number of HV apparatus in the substation with associated reduction of space requirements and costs. (3 pages)
Inspec keywords: load flow; circuit breakers; substations; maintenance engineering; power system reliability; power system protection
Subjects: Switchgear; Plant engineering, maintenance and safety; Reliability; Protection apparatus; Maintenance and reliability; Substations