Assessment of GB Transmission System 400 kV South-East Loop Reactive Compensation Requirements

Access Full Text

Assessment of GB Transmission System 400 kV South-East Loop Reactive Compensation Requirements

For access to this article, please select a purchase option:

Buy conference paper PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET International Conference on Resilience of Transmission and Distribution Networks (RTDN) 2015 — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Inspec keywords: busbars; power grids; load flow control; reactive power control; power system transient stability; voltage control; power system dynamic stability; power transmission control

Subjects: a.c. transmission; Control of electric power systems; Voltage control; Stability in control theory; Power system control; Power and energy control

Related content

content/conferences/10.1049/cp.2015.0885
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading