http://iet.metastore.ingenta.com
1887

Achieving product EMC:checklists for product development testing

Achieving product EMC:checklists for product development testing

For access to this article, please select a purchase option:

Buy chapter PDF
$16.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for $120.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
A Handbook for EMC Testing and Measurement — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Electromagnetic compatibility is a fascinating and rapidly developing field of electrical engineering. It poses important, interesting and wide ranging multidisciplinary challenges to equipment designers. It affords many technical challenges which must be met by engineers, to make consistent and meaningful measurements of complex EMI quantities. The management and quality aspects of EMC work are equally important if the technical effort expended is to be realised in terms of added value to the products being developed.

Chapter Contents:

  • 13.1 Introduction
  • 13.1.1 Chapter structure
  • 13.1.2 Example adopted
  • 13.1.3 Personal computers and information technology
  • 13.2 Information about EMC
  • 13.2.1 Customer resources
  • 13.2.2 regulatory authorities
  • 13.2.3 industry sources
  • 13.2.4 Equipment, component and subsystem suppliers
  • 13.2.5 Professional bodies and conferences
  • 13.2.6 EMC consultants and training
  • 13.2.7 Electronics and EMC technical press
  • 13.3 Determining an EMC requirement
  • 13.4 Developing an approach to EMC design
  • 13.4.1 process flow chart
  • 13.4.2 EMC strategy
  • 13.4.3 Immunity first?
  • 13.4.4 Example of EMC design process
  • 13.5 Technical construction file
  • 13.5.1 Routes to compliance-options
  • 13.5.2 Circumstances requiring the generation of a technical file
  • 13.5.3 Contents of a technical file
  • 13.5.4 Report from a competent body
  • 13.5.5 Testing or technical file?
  • 13.6 self certification
  • 13.6.1 Need for an in-house facility
  • 13.6.2 Gradual development
  • 13.6.3 Estimates of facility cost
  • 13.6.4 Turnkey facilities
  • 13.7 Conclusion
  • 13.8 References

Inspec keywords: testing; product development; electromagnetic compatibility; telecommunication industry; electromagnetic interference

Other keywords: equipment designer; electrical engineering; electromagnetic compatibility; complex EMI quantity; EMC; quality aspects; product testing; product development

Subjects: Electromagnetic compatibility and interference

Preview this chapter:
Zoom in
Zoomout

Achieving product EMC:checklists for product development testing, Page 1 of 2

| /docserver/preview/fulltext/books/cs/pbel008e/PBEL008E_ch13-1.gif /docserver/preview/fulltext/books/cs/pbel008e/PBEL008E_ch13-2.gif

Related content

content/books/10.1049/pbel008e_ch13
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address