http://iet.metastore.ingenta.com
1887

access icon openaccess Mechanical simulation and installation position optimisation of a lifting cylinder of a scissors aerial work platform

  • XML
    60.8212890625Kb
  • HTML
    70.8896484375Kb
  • PDF
    2.170262336730957MB
Loading full text...

Full text loading...

/deliver/fulltext/10.1049/joe.2018.8961/JOE.2018.8961.html;jsessionid=jm20pr5sq02h.x-iet-live-01?itemId=%2fcontent%2fjournals%2f10.1049%2fjoe.2018.8961&mimeType=html&fmt=ahah

References

    1. 1)
      • 1. Pan, Q., Zhang, Z., He, S.H., et al: ‘Fatigue life analysis and forecast of scissors arms in scissors aerial work platform’. Food Mach., 2017, 33, (5), pp. 119124.
    2. 2)
      • 2. Yin, B.: ‘The design and structural optimization of the scissors-like mobile platform’ (Changsha University of Science and Technology, Changsha, 2012), pp. 14.
    3. 3)
      • 3. Petru, M., Sevick, L., Masin, I., et al: ‘Dynamic analysis of lifting platform construction for car relocation’ (Springer International Publishing, Basel, 2014), pp. 517524.
    4. 4)
      • 4. Dong, R.G., Pan, C.S., Hartsell, J.J., et al: ‘An investigation on the dynamic stability of scissor lift ‘. Open J. Safety Sci. Technol., 2012, 02, (1), pp. 815.
    5. 5)
      • 5. Hu, X.Z., Hu, J.K., He, G.H.: ‘The modeling of scissors elevation mechanism and research of key parameters’, Mech. Res. Appl., 2006, 19, (4), pp. 8485.
    6. 6)
      • 6. Deng, H.G., Sun, D.G., You, S.K., et al: ‘Modeling and key parameters research of fork lift platform’. Mech. Electr. Eng. Technol., 2005, 34, (7), pp. 2022.
    7. 7)
      • 7. Hamidi, B.: ‘Design and calculation of the scissors-type elevating platforms’, Open J. Safety Sci. Technol., 2012, 4, pp. 2225.
    8. 8)
      • 8. Islam, M.T., Yin, C., Jian, S., et al: ‘Dynamic analysis of scissor lift mechanism through bond graph modeling’. IEEE/ASME Int. Conf. Advanced Intelligent Mechatronics, Besancon, France, 2014, pp. 13931399.
    9. 9)
      • 9. Zhao, J.S., Chu, F., Feng, Z.J.: ‘The mechanism theory and application of deployable structure based on SLE’, Mech. Mach. Theory, 2009, 44, (2), pp. 324335.
    10. 10)
      • 10. Sun, D.M., Dong, W.M., Li, S.: ‘Design of heavy-loading hydraulic fork lifting deck propelled symmetrically’, Mach. Des. Manuf., 2006, 6, pp. 2324.
    11. 11)
      • 11. Liu, T., Sun, J.: ‘Simulative calculation and optimal design of scissor lifting mechanism’. 2009 IEEE Control and Decision Conf. (CCDC '09), Guilin, China, 2009, pp. 21332136.
    12. 12)
      • 12. An, C.Q.: ‘Simulation study of an electric self-propelled scissors aerial work platform’. PhD thesis, Nanjing University of Science and Technology, 2012.
    13. 13)
      • 13. Ni, S.H., Zhang, C.: ‘Development of a new type hydraulic lifting platform’. Constr. Mach. Equip., 2011, 42, (1), pp. 5961.
    14. 14)
      • 14. Fu, Y.L., Qi, X.Y.: ‘Reference manual of LMS imagine. Lab AMESim system modeling and simulation’ (Beihang University Press, Beijing, 2011).
    15. 15)
      • 15. Shi, R.S., Liang, Q.: ‘Computer simulation of the hydraulic control lift platform with AMESim’, Machinery, 2016, 43, (8), pp. 3335.
    16. 16)
      • 16. Min, Y.N.: ‘Application guide for design of experiment (DOE)’ (China Machine Press, Beijing, 2011).
http://iet.metastore.ingenta.com/content/journals/10.1049/joe.2018.8961
Loading

Related content

content/journals/10.1049/joe.2018.8961
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address