Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Scheduling of radio-controlled heating load

Scheduling of radio-controlled heating load

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IEE Proceedings - Generation, Transmission and Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

An economic loading program has been adapted to enable it to obtain an optimum heat-load profile to meet the forecast heat requirement. The heat load is represented by a ‘generator’ whose load is constrained to be negative. The incremental cost of this unit is a heat energy price. This is adjusted to obtain a heat profile containing the requisite energy. The profile is then used by a dynamic programming algorithm to derive a commitment pattern for each block. A case study is presented which shows that the procedure can minimise heat energy cost. It is also shown that use of the proposed method results in less generator load cycling. This reduced regulation duty should improve reliability.

References

    1. 1)
      • S.D. Bond , B. Fox . Optimal thermal unit scheduling using improved dynamic programming algorithm. IEE Proc. C , 1 , 1 - 5
    2. 2)
      • F.E. Villaseca , B. Fardanesh . Fast thermal generation rescheduling. IEEE Trans. , 1 , 65 - 71
    3. 3)
      • McCann, B.M.: `Measurement and control of power system heating load', 1993, MSc, The Queen’s University of Belfast.
    4. 4)
      • B. Krekó . (1968) Linear programming.
    5. 5)
      • C. Brewer , G.F. Charles , C.C.M. Parish , J.N. Prewett , D.C. Salthouse , B.J. Terry . Performance of a predictive automatic load-dispatching system. Proc. IEE , 10 , 1577 - 1586
    6. 6)
      • A.I. McCartney . Load management using radio teleswitches within NIE. Power Eng. J. , 4 , 163 - 169
    7. 7)
      • K.M. Radi , B. Fox . Power system economic loading with flexible emergency reserve provision. IEE Proc. C , 4 , 257 - 262
    8. 8)
      • Edwardson, S.M., Eyre, B.E., Hensman, G.O., Wright, D.T.: `A radio teleswitching system for load management in UK', Proceedings of the IEE Conference on Metering, apparatusand tariffs for electricity supply, 1982, London, p. 40–46.
    9. 9)
      • Y.-Y. Hsu , C.-C. Su . Dispatch of direct load control using dynamic programming. IEEE Trans. , 3 , 1056 - 1061
    10. 10)
      • A.J. Wood , B.F. Wollenberg . (1996) Power generation, operation and control.
http://iet.metastore.ingenta.com/content/journals/10.1049/ip-gtd_19982356
Loading

Related content

content/journals/10.1049/ip-gtd_19982356
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address