Modelled operation of the Shetland Islands power system comparing computational and human operators' load forecasts

Modelled operation of the Shetland Islands power system comparing computational and human operators' load forecasts

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IEE Proceedings - Generation, Transmission and Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

A load forecasting technique, based upon an autoregressive (AR) method is presented. Its use for short term load forecasting is assessed by direct comparison with real forecasts made by human operators of the Lerwick power station on the Shetland Islands. A substantial improvement in load prediction, as measured by a reduction of RMS error, is demonstrated. Shetland has a total installed capacity of about 68 MW, and an average load (1990) of around 20 MW. Although the operators could forecast the load for a few distinct hours better than the AR method, results from simulations of the scheduling and operation of the generating plant show that the AR forecasts provide increased overall system performance. A detailed model of the island power system, which includes plant scheduling, was run using the AR and Lerwick operators' forecasts as input to the scheduling routine. A reduction in plant cycling, underloading and fuel consumption was obtained using the AR forecasts rather than the operators' forecasts in simulations over a 28 day study period. It is concluded that the load forecasting method presented could be of benefit to the operators of such mesoscale power systems.

http://iet.metastore.ingenta.com/content/journals/10.1049/ip-gtd_19952248
Loading

Related content

content/journals/10.1049/ip-gtd_19952248
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address