access icon free Process and tools for optimising wind power projects connected to weak grids

Integration of wind power plants (WPPs) into weak electric grids has gained a lot of interest in recent years due to an increase in sites with low short-circuit power at the point of connection. In response to this reality, wind turbine (WT) manufacturers have been working on developing suitable technical functionalities. However, it can be argued that technology is not the only challenge faced during the interconnection of WPP to a weak grid. This study aims at proposing and demonstrating the application of a process that can be applied to optimise many aspects of such projects and outlines the tools needed to do so. Outcomes and experiences from applying this process and its tools to a real project including steady-state and time-domain simulation results are also presented. It is shown that, in order to successfully interconnect WPPs into weak grids without putting power system safety and reliability at risk, strong collaboration between project developers, network operators, consultants and WT manufacturers is crucial. The proposed process will greatly support all stake holders involved in developing the market of WPPs connected to weak grids.

Inspec keywords: power grids; wind turbines; wind power plants; power system interconnection; optimisation

Other keywords: wind power plants; low short-circuit power; weak grids; wind power project optimisation; weak electric grids; WPP interconnection

Subjects: Optimisation techniques; Power system management, operation and economics; Wind power plants

References

    1. 1)
      • 7. Diedrichs, V., Beekmann, A., Busker, K., et al: ‘Control of wind power plants utilizing voltage source converter in high impedance grids’. 2012 IEEE Power & Energy Society General Meeting, San Diego, USA, 22–26 July 2012.
    2. 2)
      • 8. Diedrichs, V., Lorenzen, H., Beekmann, A., et al: ‘Loss of stability margin assessment during wind power plant operation in high impedance grids’. 12th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems, London, UK, October 2013.
    3. 3)
      • 15. PES, I.E.E.E.: ‘Fault current contributions from wind plants’. 2015 68th Annual Conf. for Protective Relay Engineers, 2015, pp. 137227.
    4. 4)
      • 4. Diedrichs, V., Beekmann, A., Busker, K., et al: ‘Operation of wind power plants in high impedance grids – loss of stability control for maximizing wind power vs. power quality’. 11th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems as well as on Transmission Networks for Offshore Wind Farms, Lisbon, Portugal, 13–15 November 2012.
    5. 5)
      • 13. Kundur, P.: ‘Power system stability and Control’ (McGraw-Hill, 1994).
    6. 6)
      • 5. Issacs, A.: ‘Interconnection of wind plants on weak grids’. UVIG Workshop on Integrating Variable Generation in Large Power Systems, Varennes, Canada, May 9–10 2016.
    7. 7)
      • 14. Fischer, M., Mendonca, A.: ‘Representation of variable full conversion wind energy converters for steady state short-circuit calculations’. Proc. of the IEEE PES Transmission and Distribution Conf., 2012.
    8. 8)
      • 12. Diedrichs, V., Beekmann, A., Quitmann, E., et al: ‘Wind power plants for weak grids based on type IV wind energy converters’. 13th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems, Berlin (D), 22–24 October 2014.
    9. 9)
      • 3. Diedrichs, V., Beekmann, A., Adloff, S.: ‘Loss of (angle) stability of wind power plants – the underestimated phenomenon in case of very low short circuit ratio’. Tenth Int. Workshop on Large-Scale Integration of Wind Power in Power Systems as well as on Transmission Networks for Offshore Wind Farms, Aarhus, Denmark, 25–26 October 2011.
    10. 10)
      • 17. El-Deib, A., Trevisan, A.S., Mendonca, A., et al: ‘Assessment of full-Converter wind turbines’ immunity against subsynchronous interaction using eigenvalue analysis’. 14th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems, Brussels (BE), November 2015.
    11. 11)
      • 10. Working group B4.62 - SC B4 Committee for HVDC and power electronics’. ‘Connection of Wind Farms to Weak AC Networks’, 2016.
    12. 12)
      • 9. El-Deib, A., Beekmann, A., Fischer, M., et al: ‘Stability monitoring of commercial wind power plants connected to weak grids’. 14th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems, Brussels (BE), November 2015.
    13. 13)
      • 6. Huang, F.: ‘Experience with WTG weak system interactions on the ERCOT system’. 2015 IEEE Power & Energy Society General Meeting, Denver, USA, 29 July 2015.
    14. 14)
      • 2. IEEE Guide for Planning DC Links Terminating at AC Locations Having Low Short-Circuit Capacities. IEEE Std 1204–1997.
    15. 15)
      • 16. Short-circuit currents in three-phase a.c. systems – Part 0: calculation of currents, IEC Standard 60909, 2016.
    16. 16)
      • 20. Nikolai, S., AL-Khatib, A.: ‘Testing in a demonstrator power system- a valuable part in the development of grid integration technology’. 14th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems, Brussels (BE), November 2015. [14] BS1234: ‘The title of the standard’, 2006.
    17. 17)
      • 1. Krishnayya, R.P.C.S., Piwko, T.J., Weaver, M.L., et al: ‘DC transmission terminating at low short circuit ratio locations’, IEEE Trans. Power Deliv., 1986, 1, pp. 308318.
    18. 18)
      • 18. Fischer, M., Schellschmidt, M.: ‘Fault ride through performance of wind energy converters with FACTS capabilities in response to up-to-date German grid connection requirements’. Power systems Conf. and Exposition (PSCE), 2011IEEE/PES.
    19. 19)
      • 19. Fischer, M., Engelken, S., Mihov, N., et al: ‘Operational experiences with inertial response provided by type 4 wind turbines’, IET Renew. Power Gener., 2016, 10, (1), pp. 1724.
    20. 20)
      • 11. Quitmann, E., Erdmann, E.: ‘The power system will need more! – How grid codes should look ahead’. Proc. of the 12th Int. Workshop on Large-Scale Integration of Wind Power into Power Systems, London (UK), 22–24 October 2013.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-rpg.2017.0440
Loading

Related content

content/journals/10.1049/iet-rpg.2017.0440
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading