access icon free Techno-economic evaluation of load frequency control systems for electric vehicle fleet integration

Environmental concerns and policy directives coupled with renewable energy penetration targets in Europe and United States are leading to a greater need for identifying technical and economic characteristics that facilitate the integration of electric vehicles (EVs) in the electricity network. An important step in mitigating instability associated with unregulated EV charging and renewable power feed-in is the integration of EVs as providers of load frequency control (LFC). This study presents an evaluation of six European and North American LFC systems on the basis of EV characteristics to identify suitability for EV integration. The evaluation shows that the Eastern Denmark network is most feasible for frequency containment and restoration reserve using EVs.

References

    1. 1)
      • 25. Federico, G., Rahman, D.: ‘Bidding in an electricity pay-as-bid auction’, J. Regul. Econ., 2003, 24, (2), pp. 175211.
    2. 2)
      • 28. US DOE: ‘Evaluating electric vehicle charging impacts and customer charging behaviors: smart grid investment grant program report’, December 2014.
    3. 3)
      • 23. Rebours, Y.G., Kirschen, D.S., Trotignon, M., et al: ‘A survey of frequency and voltage control ancillary services—part II: economic features’, IEEE Trans. Power Syst., 2007, 22, (1), pp. 358366.
    4. 4)
      • 5. Brooks, A.N.: ‘Vehicle-to-grid demonstration project: grid regulation ancillary service with a battery electric vehicle’ (California Environmental Protection Agency, Air Resources Board, Research Division, 2002).
    5. 5)
      • 6. Dallinger, D., Krampe, D., Wietschel, M.: ‘Vehicle-to-grid regulation based on a dynamic simulation of mobility behavior’, 2010.
    6. 6)
      • 9. P.J.M.: ‘Manual 12: balancing operations’, 2013(PJM, 2013).
    7. 7)
      • 35. Bundesnetzagentur: ‘Festlegung zu Verfahren zur Ausschreibung von Regelenergie in Gestalt von Sekundärregelung’, 12.04.2011.
    8. 8)
      • 36. NGET: ‘Firm Frequency Response tender rules and standard contract terms’, April 2014.
    9. 9)
      • 20. ENSTO-E: ‘Supporting document for the network code on load-frequency control and reserves’, 28.06.2013.
    10. 10)
      • 8. P.J.M.: ‘15: cost development guidelines’. Cost Development Sub-Committee (February 2012), 2006.
    11. 11)
      • 22. Schlegel, S., Schwerdfeger, R., Jiang, T.E.A.: ‘Untersuchung Potentiale gesteuertes Laden unter Nutzung der vollen Kommunikationsmöglichkeiten zwischen Ladeinfrastruktur und Fahrzeug: Teilprojekt 4’ (Berlin, 07/2016).
    12. 12)
      • 16. Energinet.dk: ‘The balancing market and balance settlement: regulation C2’, December 2008.
    13. 13)
      • 27. Heim, S., Götz, G.: ‘Do pay-as-bid auctions favor collusion? evidence from Germany's market for reserve power’. Evidence from Germany's Market for Reserve Power, 2013.
    14. 14)
      • 32. NGET: ‘Firm frequency response (FFR): tender assessment principles’, August 2015.
    15. 15)
      • 19. ENTSOE-E, T.E.: ‘Operation handbook, P1–policy 1: load frequency control and performance [C]’. ed: Retrieved March 2010.
    16. 16)
      • 21. Kundur, P., Balu, N.J., Lauby, M.G.: ‘Power system stability and control’ (McGraw-hill, New York, 1994).
    17. 17)
      • 1. Clement-Nyns, K., Haesen, E., Driesen, J.: ‘The impact of charging plug-in hybrid electric vehicles on a residential distribution grid’, IEEE Trans. Power Syst., 2010, 25, (1), pp. 371380.
    18. 18)
      • 29. Kempton, W., Tomić, J.: ‘Vehicle-to-grid power fundamentals: calculating capacity and net revenue’, J. Power Sources, 2005, 144, (1), pp. 268279.
    19. 19)
      • 14. RTE: ‘Référentiel Technique de RTE, Gestionnaire du Réseau de Transport d'Electricité’, 01.02.2009.
    20. 20)
      • 11. Forum Netztechnik/Netzbetrieb im VDE (FNN): ‘Transmission Code 2007 Anhang D2 Teil 2: Anforderungen für die Umsetzung des SRL Poolkonzepts zwischen ÜNB und Anbietern’ (Berlin, 01.11.2009).
    21. 21)
      • 30. North American Electric Reliability Corporation: ‘NERC ancillary services matrix’.
    22. 22)
      • 31. ‘Internetplattform zur Vergabe von Regelleistung’. Available at https://www.regelleistung.net/ext/, accessed April 2015.
    23. 23)
      • 33. Bundesnetzagentur: ‘Festlegung zu Verfahren zur Ausschreibung von Regelenergie in Gestalt von Primärregelung’, 31.08.2007.
    24. 24)
      • 10. Forum Netztechnik/Netzbetrieb im VDE (FNN): ‘Transmission Code 2007 Anhang D2 Teil 1: Unterlagen zur Präqualifikation für die Erbringung von Primärregelleistung für die ÜNB - Präqualifikationsunterlagen’ (Berlin, November 2009).
    25. 25)
      • 2. Tomić, J., Kempton, W.: ‘Using fleets of electric-drive vehicles for grid support’, J. Power Sources, 2007, 168, (2), pp. 459468.
    26. 26)
      • 4. Jiang, T., Schwerdfeger, R., Schlegel, S., et al (eds.): ‘Design of a simulation model to analyze the consequences of using electric vehicles to provide control reserve’ (IEEE, 2015).
    27. 27)
      • 26. Kahn, A.E., Cramton, P., Porter, R.H., et al: ‘Pricing in the California power exchange electricity market: should California switch from uniform pricing to pay-as-bid pricing?Blue Ribbon Panel Report, California Power Exchange, 2001.
    28. 28)
      • 18. Energinet.dk: ‘Ancillary services to be delivered in Denmark: tender conditions’, 3.10.2012.
    29. 29)
      • 7. Manual, P.J.: ‘11: energy & ancillary services market operations’. Prepared by Forward Market Operations group at PJM, 2013.
    30. 30)
      • 13. NGET: ‘Grid Code’, 03.02.2016, 15th edn..
    31. 31)
      • 15. Polish Power Grid Company S.A: ‘Instruction of transmission system operation and maintenance (Unofficial Translation): detailed part no. 2: rules of ancillary services’, 19.07.2011.
    32. 32)
      • 34. ‘Ancillary services’. Available at https://clients.rte-france.com/lang/an/clients_producteurs/services_clients/services_systeme.jsp, accessed July 2014.
    33. 33)
      • 12. Forum Netztechnik/Netzbetrieb im VDE (FNN): ‘Transmission Code 2007 Anhang D3 Teil 1: Unterlagen zur Präqualifikation für die Erbringung vonMinutenreserveleistung’ (Berlin, 24.08.2007).
    34. 34)
      • 17. Energinet.dk: ‘Technical regulation for thermal power station units larger than 11 kW and smaller than 1.5 MW: regulation for grid connection TF 3.2.4’, 01.10.2008, 4th edn..
    35. 35)
      • 24. Oren, S. (ed.): ‘When is a pay-as bid preferable to uniform price in electricity markets’, 2004.
    36. 36)
      • 3. Han, S., Han, S., Sezaki, K.: ‘Development of an optimal vehicle-to-grid aggregator for frequency regulation’, IEEE Trans. Smart Grid, 2010, 1, (1), pp. 6572.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-rpg.2016.0589
Loading

Related content

content/journals/10.1049/iet-rpg.2016.0589
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address