© The Institution of Engineering and Technology
This study considers generation and demand challenges of a 100% renewable UK electricity grid and how this could be addressed with interconnection or energy storage. Hourly demand and electricity generation profiles for a year have been constructed: Business as Usual (BAU) with a yearly demand of 540 TWh and Green Plus (GP) with a demand of 390 TWh, Two further scenarios based on the above have been considered with electrification of heating (ASHP) and electric vehicle transportation (EV). The resultant hourly imbalances have been used to calculate the interconnection and energy storage requirements. This paper discusses the findings of the BAU scenario. The calculated interconnector capacity required was found to be 60 GW and cost £58 billion. Energy storage capacity requirements vary depending on the selected technology. Rated capacity was estimated to be 14 GW with storage capacity of 3 TWh for pumped storage, 11 GW and 2.3 TWh for liquid air, and 65 GW and 13.6 TWh for hydrogen storage, at a cost of £65, £76 and £45 billion respectively. This paper indicates that storing hydrogen in underground caverns would offer the cheapest solution. However, whilst these technological solutions can address generation and demand imbalance in a fully renewable electricity grid, there clearly remain barriers to each technology.
References
-
-
1)
-
33. Hassett, B., Bower, E., Alexander, M.: ‘MERGE WP 3 task 3.2: evaluation of the impact that progressive deployment of EV will provoke on electricity demand, steady state operation, market issues, generation schedules and on the volume of carbon emissions’ (Ricardo, European Commission, 2011).
-
2)
-
3)
-
6. Trainer, T.: ‘Can Europe run on renewable energy? A negative case’, .
-
4)
-
2. Elliston, B., Diesendorf, M., MacGill, I.: ‘Simulations of scenarios with 100% renewable electricity in the Australian National Electricity Market’, Energy Policy, 2012, 45, pp. 606–613 (doi: 10.1016/j.enpol.2012.03.011).
-
5)
-
69. Evans, A., Strezov, V., Evans, T.J.: ‘Assessment of utility energy storage options for increased renewable energy penetration’, Renew. Sust. Energy Rev., 2012, 16, pp. 4141–4147 (doi: 10.1016/j.rser.2012.03.048).
-
6)
-
70. Koohi-Kamali, S., Tyagi, V.V., Rahim, N.A., Panwar, N.L., Mokhlis, H.: ‘Emergence of energy storage technologies as the solution for reliable operation of smart power systems: a review’, Renew. Sust. Energy Rev., 2013, 25, pp. 135–165 (doi: 10.1016/j.rser.2013.03.056).
-
7)
-
77. MacKay, D.J.: ‘Sustainable energy – without the hot air’ (UIT Cambridge Ltd. 368, Cambridge, UK, 2009).
-
8)
-
35. De Blecourt, M.J.: Load-shifting in a new perspective – smart scheduling of smart household appliances using an agent-based modelling approach’. Faculty of Technology, Policy and Management, 2012, Delf University of Technology, Delf. p. 106.
-
9)
-
62. Ruberg, S., Ferreira, H., L'Abbate, A., et al: .
-
10)
-
11)
-
12)
-
49. Hardisty, J.: ‘The tidal stream power curve: a case study’, Energy Power Eng., 2011, 4, pp. 132–136 (doi: 10.4236/epe.2012.43018).
-
13)
-
66. Grant-Wilson, I.A., McGregor, P.G., Hall, P.J.: ‘Energy storage in the UK electrical network: estimation of the scale and review of technology options’, Energy Policy, 2010, 38, pp. 4099–4106 (doi: 10.1016/j.enpol.2010.03.036).
-
14)
-
74. Arbon, I., Price, A., Evison, T., et al: ‘Round Table 1 – Liquid Air and the Electricity Grid’, 2013.
-
15)
-
11. Krajacic, G., Duic, N., Da Graca Carvalho, M.: ‘How to achieve a 100% RES electricity supply for Portugal’, Appl. Energy, 2011, 88, pp. 508–517 (doi: 10.1016/j.apenergy.2010.09.006).
-
16)
-
18. Segurado, R., Krajacic, G., Duic, N., Alves, L.: ‘Increasing the penetration of renewable energy resources in S. Vicente, Cape Verde’, Appl. Energy, 2011, 88, pp. 466–472 (doi: 10.1016/j.apenergy.2010.07.005).
-
17)
-
59. Hulle, F.V.: ‘Integrating wind – developing Europe's power market for the large-scale integration of wind power’, .
-
18)
-
20. Zervos, A., Lins, C., Muth, J.: ‘RE-thinking 2050 – a 100% renewable energy vision for the European Union’, (European Renewable Energy Council, Brussels, Belgium, 2010).
-
19)
-
50. Drax: ‘About Drax's biomass plans’. 2013.
-
20)
-
54. Gross, R., Heptonstall, P., Leach, M., et al: ‘Renewables and the grid: understanding intermittency’. Proc. of the Institution of Civil Engineers – Energy, 2007, vol. 160, pp. 31–41.
-
21)
-
71. Kouskou, T., Bruel, P., Jamil, A., Rhafiki, T.E., Zeraouli, Y.: ‘Energy storage: applications and challenges’, Sol. Energy Mater. Solar Cells, 2014, 120, pp. 59–80 (doi: 10.1016/j.solmat.2013.08.015).
-
22)
-
19. Duic, N., da Graca Carvalho, M.: ‘Increasing renewable energy sources in island energy supply: case study Porto Santo’, Renew. Sust. Energy Rev., 2004, 8, pp. 383–399 (doi: 10.1016/j.rser.2003.11.004).
-
23)
-
24)
-
25)
-
51. SKM: ‘Geothermal energy potential in Great Britain and Northern Ireland’ (Sinclair Knight Merz, London, 2012).
-
26)
-
56. NationalGrid: ‘Interconnectors’. 2012.
-
27)
-
48. NOC: ‘Tidal energy from UK coastal waters’. 2013.
-
28)
-
57. Purvins, A., Wilkening, H., Fulli, G., et al: ‘A European supergrid for renewable energy: local impacts and far-reaching challenges’, J. Clean. Prod., 2011, 19, pp. 1909–1916 (doi: 10.1016/j.jclepro.2011.07.003).
-
29)
-
3. Milborrow, D., Gonzalez, S.: ‘The carbon trust & DTI renewables network impact study annex 4: intermittency literature survey & roadmap’ (Mott MacDonald, Brighton, UK, 2003).
-
30)
-
79. Trompeteler, P.: ‘Discussion about LAES and Isle of Grain storage facility’, in Alexander, M., (Ed.) : Shoreham-By-Sea, UK, 2013.
-
31)
-
80. Ozarslan, A.: ‘Large-scale hydrogen energy storage in salt caverns’, Hydrog. Energy, 2012, 37, pp. 14265–14277 (doi: 10.1016/j.ijhydene.2012.07.111).
-
32)
-
5. Heide, D., et al: ‘Seasonal optimal mix of wind and solar power in a future, highly renewable Europe’, Renew. Energy, 2010, 35, pp. 2483–2489 (doi: 10.1016/j.renene.2010.03.012).
-
33)
-
46. DECC: ‘Weekly solar PV installation & capacity based on registration date’, 2014, .
-
34)
-
72. Denholm, P., Sioshansi, R.: ‘The value of compressed air energy storage with wind in transmission-constrained electric power systems’, Energy Policy, 2009, 37, pp. 3149–3158 (doi: 10.1016/j.enpol.2009.04.002).
-
35)
-
34. DECC: ‘Digest of UK Energy Statistics (DUKES) – Chapter 5: Electricity’. 2012.
-
36)
-
73. Strbac, G., Aunedi, M., Pudjianto, D., et al: ‘Strategic assessment of the role and value of energy storage systems in the UK low carbon energy future’ (Energy Futures Lab, , London, UK, 2012).
-
37)
-
37. Gardner, P.: ‘UK generation and demand scenarios for 2030’ (Garrad Hassan & Partners Ltd, Glasgow, 2011).
-
38)
-
22. Lund, H.: ‘Renewable energy strategies for sustainable development’, Energy, 2007, 32, pp. 912–919 (doi: 10.1016/j.energy.2006.10.017).
-
39)
-
82. NationalGrid: ‘2011 National Electrical Transmission System (NETS) Seven Year Statement’. 2011.
-
40)
-
52. DECC and WAG: ‘England and wales hydropower resource assessment’ (Department of Energy and Climate Change and Welsh Assembly Government, 2010).
-
41)
-
36. Frontier Economics and Sustainability First: ‘Demand side response in the domestic sector – a literature review of major trials’, 156.
-
42)
-
7. Steinke, F., Wolfrum, P., Hoffmann, C.: ‘Grid vs. storage in a 100% renewable Europe’, Renew. Energy, 2013, 50, pp. 826–832 (doi: 10.1016/j.renene.2012.07.044).
-
43)
-
23. Lund, H., Andersen, A.N., Ostergaard, P.A., Mathiesen, B.V., Connolly, D.: ‘From electricity smart grids to smart energy systems – a market operations based approach and understanding’, Energy, 2012, 42, pp. 96–102 (doi: 10.1016/j.energy.2012.04.003).
-
44)
-
4. Glasnovic, Z., Margeta, J.: ‘Vision of total renewable electricity scenario’, Renew. Sust. Energy Rev., 2011, 15, pp. 1873–1884 (doi: 10.1016/j.rser.2010.12.016).
-
45)
-
H. Lund
.
Large-scale integration of wind power into different energy systems.
Energy
,
2402 -
2412
-
46)
-
47. TRNSYS: ‘TRNSYS Transient System Simulation Tool’. 2013.
-
47)
-
63. Chote, R., Nickell, S., Parker, G.: ‘Economic and fiscal outlook’, .
-
48)
-
81. Barton, J., Huang, S., Infiled, D., et al: ‘The evolution of electricity demand and the role for demand side participation, in buildings and transport’, Energy Policy, 2013, 52, pp. 85–102 (doi: 10.1016/j.enpol.2012.08.040).
-
49)
-
61. SKM: ‘Offshore grid development for a secure renewable future – a UK perspective’ (Sinclair Knight Merz: Newcastle upon Tyne, UK, 2010).
-
50)
-
26. DECC: ‘Weather statistics – average wind speed and deviations from the long term mean (ET 7.2)’, 2012, .
-
51)
-
60. Czisch, G., Giebel, G.: ‘Realisable scenarios for a future electricity supply based 100% on renewable energies’. Riso Int. Energy Conf., Riso, Denmark, 2007.
-
52)
-
55. Saguan, M., Ahner, N., de Hauteclocque, A., Glachant, J.-M.: ‘The UK charging system on interconnectors’ (Florence School of Regulation, Florence, Italy, 2011).
-
53)
-
68. Connolly, D., Lund, H., Mathiesen, B.V., Pican, E., Leahy, M.: ‘The technical and economic implications of integrating fluctuating renewable energy using energy storage’, Renew. Energy, 2012, 43, pp. 47–60 (doi: 10.1016/j.renene.2011.11.003).
-
54)
-
27. NationalGrid: ‘Metered half-hourly electricity demands’. 2013.
-
55)
-
38. Arup: ‘Review of generation costs and deployment potential of renewable electricity technologies in the UK’ (Ove Arup & Partners Ltd., London, 2011).
-
56)
-
57)
-
13. Mason, I.G., Page, S.C., Williamson, A.G.: ‘A 100% renewable electricity generation system for New Zealand utilising hydro, wind, geothermal and biomass resources’, Energy Policy, 2010, 38, pp. 3973–3984 (doi: 10.1016/j.enpol.2010.03.022).
-
58)
-
10. Krajacic, G., et al: ‘Planning for a 100% independent energy system based on smart energy storage for integration of renewables and CO2 emissions reduction’, Appl. Thermal Eng., 2011, 31, pp. 2073–2083 (doi: 10.1016/j.applthermaleng.2011.03.014).
-
59)
-
32. Boardman, B., Darby, S., Killip, G., et al: ‘40% house’ (Environmental Change Institute, Oxford, 2005).
-
60)
-
31. Elders, I., Ault, G., Galloway, S., et al: ‘Electricity network scenarios for Great Britain in 2050’ (Institute for Energy and Environment, Glasgow, 2006).
-
61)
-
12. Connolly, D., Lund, H., Mathiesen, B.V., Leahy, M.: ‘The first step towards a 100% renewable energy-system for Ireland’, Appl. Energy, 2011, 88, pp. 502–507 (doi: 10.1016/j.apenergy.2010.03.006).
-
62)
-
M. Black ,
G. Strbac
.
Value of storage in providing balancing services for electricity generation systems with high wind penetration.
J. Power Sources
,
2 ,
949 -
953
-
63)
-
64)
-
75. Schoenung, S.: ‘Economic analysis of large-scale hydrogen storage for renewable utility applications’ (Sandia National Laboratories, Albuquerque, New Mexico, USA, 2011).
-
65)
-
2. DECC: ‘Smarter Grids: The Opportunity’, .
-
66)
-
17. Krajacic, G., Duic, N., Da Graca Carvalho, M.: ‘H2RES, energy planning tool for island energy systems – the case of the Island of Mljet’, Hydrog. Energy, 2009, 34, pp. 7015–7026 (doi: 10.1016/j.ijhydene.2008.12.054).
-
67)
-
16. Ostergaard, P.A., Lund, H.: ‘A renewable energy system in Frederikshavn using low-temperature geothermal energy for district heating’, Appl. Energy, 2011, 88, pp. 479–487 (doi: 10.1016/j.apenergy.2010.03.018).
-
68)
-
67. Grant-Wilson, I.A., McGregor, P.G., Infield, D.G., Hall, P.J.: ‘Grid-connected renewables, storage and the UK electricity market’, Renew. Energy, 2011, 36, pp. 2166–2170 (doi: 10.1016/j.renene.2011.01.007).
-
69)
-
58. Battaglini, A., Lilliestam, J., Haas, A., Patt, A.: ‘Development of supersmart grids for a more efficient utilisation of electricity from renewable sources’, J. Clean. Prod., 2009, 17, pp. 911–918 (doi: 10.1016/j.jclepro.2009.02.006).
-
70)
-
9. Cosic, B., Krajacic, G., Duic, N.: ‘A 100% renewable energy system in the year 2050: the case of Macedonia’, Energy, 2012, 48, pp. 80–87 (doi: 10.1016/j.energy.2012.06.078).
-
71)
-
40. Estate, T.C.: ‘UK offshore wind report’ (The Crown Estate, London, 2012).
-
72)
-
53. Forrest, N., Abel, T., Baker, K., et al: ‘Scottish hydropower resource study’ (Nick Forrest Associates, SISTech and Black & Veatch, 2008).
-
73)
-
44. GRO: ‘Estimates of Households and Dwellings in Scotland’. 2013.
-
74)
-
1. EC: ‘Roadmap 2050 – Sectoral perspective’. 2011 08 March 2011.
-
75)
-
39. Ernst & Young: ‘Cost of and financial support for wave, tidal stream and tidal range generation in the UK’ (Ernst & Young LLP and Black & Veatch, 2010).
-
76)
-
78. NationalGrid: ‘National Grid LNG – UK leaders in LNG importation’ (National Grid, Kent, 2009).
-
77)
-
8. Lund, H., Mathiesen, B.V.: ‘Energy system analysis of 100% renewable energy systems-the case of Denmark in years 2030 and 2050’, Energy, 2009, 34, pp. 524–531 (doi: 10.1016/j.energy.2008.04.003).
-
78)
-
76. DOE: ‘DOE global energy storage database’ (Sandia Corporation, 2012).
-
79)
-
80)
-
15. Ostergaard, P.A., Mathiesen, B.V., Moller, B., Lund, H.: ‘A renewable energy scenario for Aalborg municipality based on low-temperature geothermal heat, wind power and biomass’, Energy, 2010, 35, pp. 4892–4901 (doi: 10.1016/j.energy.2010.08.041).
-
81)
-
25. MetOffice: ‘Average December finishes a warm 2011’. 2011.
-
82)
-
41. 4COffshore: ‘Offshore Wind Farms Database’. 2013.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-rpg.2014.0042
Related content
content/journals/10.1049/iet-rpg.2014.0042
pub_keyword,iet_inspecKeyword,pub_concept
6
6