access icon free Spatio-temporal analysis of possible wind generation output reductions for the Irish transmission system with a high penetration of renewables

This study outlines a modelling methodology utilised by EirGrid, the Irish Transmission System Operator, to apportion reductions in electricity output from wind powered generators because of a variety of security of supply issues and localised transmission congestion. A set of production cost simulations compiled to account for hypothetical dispatches on the Irish transmission system extending over the period 2011–2022 are reported using actual application data. Studies addressing security of supply set a limit for non-synchronous generation such as wind to be between 50 and 75% of the total system generation (demand plus exports) over the interval. The potential impact of the 75% maximum instantaneous wind penetration limit possible on the small, synchronous and relatively-isolated Irish transmission system by 2020 is assessed. Ireland is expected to achieve the majority of its 40% renewable target in electricity from wind and there will invariably be instances when the amount of wind generation will be greater than demand. This should also be seen in the context of transmission congestion where wind generation connects on a non-firm basis prior to completion of their deep assets. The description of the advanced and novel methodology used to determine these reductions is presented here.

Inspec keywords: AC generators; power transmission economics; wind power plants; power generation dispatch; costing

Other keywords: production cost simulation; wind generation output reductions; hypothetical dispatches; wind-powered generators; Irish transmission system operator; relatively-isolated Irish transmission system; nonsynchronous generation; renewable penetration; EirGrid; maximum instantaneous wind penetration limit; renewable target; supply security; spatiotemporal analysis; modelling methodology; localised transmission congestion

Subjects: Power transmission, distribution and supply; Wind power plants; Power system management, operation and economics; a.c. machines

References

    1. 1)
      • 18. EirGrid: ‘Interconnection Economic Feasibility Report’, 2009.
    2. 2)
      • 5. S.E.M. Committee: ‘Single Electricity Market Principles of Dispatch and the Design of the Market Schedule in the Trading and Settlement Code: A Consultation Paper’, 2009.
    3. 3)
      • 13. EirGrid: ‘GRID25: A Strategy for the Development of Ireland's Electricity Grid for a Sustainable and Competitive Future’, 2009.
    4. 4)
      • 17. EirGrid: ‘Gate 3 ITC Programme Final Results Scheduled Firm Access Quantities’, 2010.
    5. 5)
      • 11. SONI: ‘Forecasting Peak Demand and Annual Energy Consumption in the Economic Downturn’, 2009.
    6. 6)
      • 1. The European Parliament and Council: ‘DIRECTIVE 2009/28/EC on the promotion of the use of energy from renewable sources and amending and subsequently repealing Directives 2001/77/EC and 2003/30/EC’, 2009.
    7. 7)
      • 4. Commission for Energy Regulation: ‘CER Direction on Criteria for Gate 3 and Related Matters’, 2008.
    8. 8)
      • 7. Commission for Energy Regulation and Northern Ireland Authority for Utility Regulation: ‘2009–10 Validated SEM Generator Data Parameters PUBLIC v1’, 2009.
    9. 9)
      • 9. EirGrid: ‘Gate 3 Node Assignments’, 2011.
    10. 10)
      • 3. Department of Environment, Heritage and Local Government: ‘Ireland's Carbon Budget 2009’, 2008.
    11. 11)
      • 6. Louie, H., Strunz, K.: ‘Locational marginal pricing in North American power systems’ (ETG-Fachbericht-Netzregelung und Systemführung, 2008).
    12. 12)
      • 16. EirGrid and SONI: ‘All Island TSO Facilitation of Renewables Studies’, 2010.
    13. 13)
      • 10. EirGrid: ‘Update to GENERATION ADEQUACY REPORT 2009–2015’, 2009.
    14. 14)
      • 8. S.E.M. Committee: ‘Principles of Dispatch and the Design of the Market Schedule in the Trading and Settlement Code’, 2011.
    15. 15)
      • 12. EirGrid: ‘Transmission Forecast Statement 2008–2014’, 2008.
    16. 16)
      • 2. Department of Communications, Energy and Natural Resources: ‘National Renewable Energy Action Plan Ireland’, 2009.
    17. 17)
      • 14. Ofgem: ‘Electricity Capacity Assessment’, 2012.
    18. 18)
      • 15. Department of Communications, Energy and Natural Resources and Department of Enterprise, Trade and Investment: ‘All Island Grid Study’, 2008.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-rpg.2013.0065
Loading

Related content

content/journals/10.1049/iet-rpg.2013.0065
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading