http://iet.metastore.ingenta.com
1887

Vehicle scheduling approach and its practice to optimise public bicycle redistribution in Hangzhou

Vehicle scheduling approach and its practice to optimise public bicycle redistribution in Hangzhou

For access to this article, please select a purchase option:

Buy eFirst article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
— Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Public bicycle sharing programmes (PBSPs) have become increasingly popular across many urban areas in China. Hangzhou PBSP is the world's largest and forms this case study. The management of this large inventory of bicycles is a particularly challenging issue with the goal to ensure the demand for bicycles is met at all times across the network. To this end, an efficient scheduling approach is needed with the capacity to guide the redistribution of bicycles across the self-service stations. Drawing on 7 years of disaggregate trip data, this study first captures the usage dynamics across both space and time to extract the candidate stations and redistribution periods for vehicle scheduling. A region partition method with K-means clustering is proposed to satisfy the real-time requirement of large-scale PBSPs' redistribution. Moreover, drawing on the variations in demand a back-propagation neural network short-term prediction model is computed to inform the necessary prospective redistribution of bicycles to ensure demand is always met. Finally, a vehicle scheduling model employing a rolling horizon scheduling algorithm is established and implemented in a GIS-based prototype system. The prototype is evaluated through its effectiveness and found benefit for following 18 months of practical operation in Hangzhou PBSP.

http://iet.metastore.ingenta.com/content/journals/10.1049/iet-its.2017.0274
Loading

Related content

content/journals/10.1049/iet-its.2017.0274
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address