Assessing the strategic benefits of distributed generation ownership for DNOs
Assessing the strategic benefits of distributed generation ownership for DNOs
- Author(s): P. Siano ; L.F. Ochoa ; G.P. Harrison ; A. Piccolo
- DOI: 10.1049/iet-gtd:20080235
For access to this article, please select a purchase option:
Buy article PDF
Buy Knowledge Pack
IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.
Thank you
Your recommendation has been sent to your librarian.
- Author(s): P. Siano 1 ; L.F. Ochoa 2 ; G.P. Harrison 2 ; A. Piccolo 1
-
-
View affiliations
-
Affiliations:
1: Department of Information & Electrical Engineering, University of Salerno, Fisciano, Italy
2: Institute for Energy Systems, School of Engineering and Electronics, University of Edinburgh, Edinburgh, UK
-
Affiliations:
1: Department of Information & Electrical Engineering, University of Salerno, Fisciano, Italy
- Source:
Volume 3, Issue 3,
March 2009,
p.
225 – 236
DOI: 10.1049/iet-gtd:20080235 , Print ISSN 1751-8687, Online ISSN 1751-8695
- « Previous Article
- Table of contents
- Next Article »
The potential for distributed generation (DG) to act as an alternative distribution planning option is now well-recognised by academia and industry, and could play a significant role in electricity distribution utility operation and design. However, the unbundling requirements of European Directive 2003/54/EC, coupled with traditional network planning approaches adopted by European Distribution Network Operators (DNOs), appear to be hindering development of DG and its deployment for distribution network ancillary services. The incentives – or otherwise – that arise from alternative models of DG ownership by bundled and unbundled distribution utilities are examined here. The preference for the siting and sizing of DG installations by DNOs is simulated using a multi-year multi-period optimal power flow. Broadly based on the recent UK regulatory framework, the DG ownership issue and its potential to influence DG penetration are explored.
Inspec keywords: distributed power generation; load flow; power distribution planning
Other keywords:
Subjects: Distribution networks; Power system planning and layout
References
-
-
1)
- Greatbanks, J.A., Popovic, D.H., Begovic, M., Pregelj, A., Green, T.C.: `On optimization for security and reliability of power systems with distributed generation', Proc. IEEE Power Tech. Conf., June 2003, Bologna, p. 8.
-
2)
- Zimmerman, R.D., Thomas, R.J., Gan, D., Murillo-Sanchez, C.: `An Internet-based platform for testing generation scheduling auctions', Proc. Thirty-First Hawaii International Conf. System Sciences, January 1998, Hawaii, p. 138–146.
-
3)
- J. Bisschop , M. Roelofs . (2006) AIMMS – The user's guide.
-
4)
- (2007) Distributed generation ownership issues, review of current practices, future options and European policy recommendations.
-
5)
- D.J. Morrow . (2008) Personal communication.
-
6)
- B. Murray . (1998) Electricity markets: investment, performance and analysis.
-
7)
- , : `Integrating distributed energy resources into emerging electricity markets: scoping study', Final, August 2004, Electricity Innovation Institute, Palo Alto, CA, USA.
-
8)
- Brunekreeft, G., Ehlers, E.: `Does ownership unbundling of the distribution networks distort the development of distributed generation?', 4thConf. Applied Infrastructure Research, 8 October 2005, Berlin, Germany.
-
9)
- (2007) The potential benefits of distributed generation and rate-related issues that may impede their expansion, a study pursuant to section 1817 of the Energy Policy Act of 2005.
-
10)
- (2004) Electricity distribution price control review – final proposals.
-
11)
- P.N. Vovos , A.E. Kiprakis , A.R. Wallace , G.P. Harrison . Centralized and distributed voltage control: impact on distributed generation penetration. IEEE Trans. Power Syst. , 1 , 476 - 483
-
12)
- G. Heffner , C.K. Woo , B. Horii , D. Lloyd-Zannetti . Variations in area- and time-specific marginal capacity costs of electricity distribution. IEEE Trans. Power Syst. , 2 , 560 - 567
-
13)
- G.P. Harrison , A.R. Wallace . Optimal power flow evaluation of distribution network capacity for the connection of distributed generation. IEE Proc. Gener. Transm. Distrib. , 1 , 115 - 122
-
14)
- Directive 2005/89/EC of the European Parliament and of the Council of 18 January 2006 concerning measures to safeguard security of electricity supply and infrastructure investment, Official Journal of the European Union, L33/22-27, 4th February 2006.
-
15)
- M. Scheepers , D. Bauknecht , J. Jansen . (2007) Regulatory improvements for effective integration of distributed generation into electricity distribution networks: summary of the DG-GRID project results.
-
16)
- Triggianese, M., Liccardo, F., Marino, P.: `Ancillary services performed by distributed generation in grid integration', Proc. International Conf. Clean Electrical Power (ICCEP), 2007, p. 164–170.
-
17)
- G.P. Harrison , A. Piccolo , P. Siano , A.R. Wallace . Hybrid GA and OPF evaluation of network capacity for distributed generation connections. Electr. Power Syst. Res. , 3 , 392 - 398
-
18)
- V.H. Mendez , J. Rivier , T. Gomez . Assessment of energy distribution losses for increasing penetration of distributed generation. IEEE Trans. Power Syst. , 2 , 533 - 540
-
19)
- P.N. Vovos , G.P. Harrison , A.R. Wallace , J.W. Bialek . Optimal power flow as a tool for fault level-constrained network capacity analysis. IEEE Trans. Power Syst. , 2 , 734 - 741
-
20)
- H.A. Gil , G. Joos . On the quantification of the network capacity deferral value of distributed generation. IEEE Trans. Power Syst. , 4 , 1592 - 1599
-
21)
- D. Das . A fuzzy multiobjective approach for network reconfiguration of distribution systems. IEEE Trans. Power Deliv. , 1 , 202 - 209
-
22)
- Wang, D., Ochoa, L.F., Harrison, G.P., Dent, C., Wallace, A.R.: `Distribution system planning considering investment deferral due to distributed generation', Proc. 16th Power Systems Computation Conf. (PSCC), July 2008, Glasgow.
-
23)
- Kingston, T., Stovall, T., Kelly, J.: `Exploring distributed energy alternatives to electrical distribution grid expansion', Final, December 2005, Des Plaines, IL, USA.
-
24)
- W. Shirley , R. Cowart , R. Sedano , F. Weston , C. Harrington , D. Moskovitz . (2001) State electricity regulatory policy and distributed resources: distribution system cost methodologies for distributed generation.
-
25)
- A. Pregelj , M. Begovic , A. Rohatgi . Recloser allocation for improved reliability of DG-enhanced distribution networks. IEEE Trans. Power Syst. , 3 , 1442 - 1449
-
26)
- Dunstan, C.: `Demand response initiatives in NSW', IEA Task XIII Demand Response Workshop, Sustainability Victoria, November 2005, Melbourne.
-
27)
- W. El-Khattam , K. Bhattacharya , Y. Hegazy , M.M.A. Salama . Optimal investment planning for distributed generation in a competitive electricity market. IEEE Trans. Power Syst. , 3 , 1674 - 1684
-
28)
- Jamasb, T., Neuhoff, K., Newbery, D., Pollitt, M.: `Long-term framework for electricity distribution access charges', Ofgem, March 2005, London.
-
29)
- G. Strbac , N. Jenkins , P. Djapic , M. Hurd , G. Nicholoson . (2003) Benefits of active management.
-
30)
- (2004) Electricity tariff structures review: international comparisons.
-
31)
- V.H. Mendez , J. Rivier , J.I. De La . Impact of distributed generation on distribution investment deferral. Int. J. Electr. Power Energy Syst. , 4 , 244 - 252
-
32)
- G.P. Harrison , A. Piccolo , P. Siano , A.R. Wallace . Exploring the trade-offs between incentives for distributed generation developers and DNOs. IEEE Trans. Power Syst. , 2 , 821 - 828
-
33)
- Directive 2003/54/EC of the European Parliament and of the Council of 26 June 2003 concerning common rules for the internal market in electricity and repealing Directive 96/92/EC, Official Journal of the European Union, L176/33-55, 15th July 2003.
-
34)
- , : `The operating environment for distribution companies', 2004-233-0005, February 2005, Union of the Electricity Industry – EURELECTRIC, Brussels.
-
35)
- (2006) Engineering Recommendation P2/6 – Security of Supply.
-
36)
- G.P. Harrison , A. Piccolo , P. Siano , A.R. Wallace . Distributed generation capacity evaluation using combined genetic algorithm and OPF. Int. J. Emerging Electr. Power Syst. , 2 , 1 - 13
-
1)