http://iet.metastore.ingenta.com
1887

Renewable energy sources for complete optimal power system black-start restoration

Renewable energy sources for complete optimal power system black-start restoration

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Integration of renewable energy sources (RESs) may increase the risk of power system blackouts because of the uncertainty nature of their output power. In the meantime, RESs have relatively short starting time when compared with non-black start (BS) generating units. For this reason, RES needs to participate in power system restoration after blackouts. For a complete power system restoration, three stages must be completed. These stages are: generation restoration, transmission system restoration and load pick up. To achieve a faster restoration process, an optimal schedule for the BS units to crank the non-BS (NBS) units is required with optimal transmission path selection. In addition, to maintain the stability of the system and satisfy the system operational constraints, an optimal load pick-up sequence is required. In this study, the firefly algorithm (FA) is used to find the optimal final sequence of NBS units restoration, transmission paths and load pick-up sequence with and without the aid of RES in the system. The objective is to minimise the overall restoration time and the unserved load which maximise the energy capability and improve the sustainability of the system. The proposed algorithm is applied successfully to the IEEE 39-bus system.

References

    1. 1)
      • 1. Zhu, H., Liu, Y.: ‘Aspects of power system restoration considering wind farms’. Proc. SUPERGEN, 2012, pp. 15.
    2. 2)
      • 2. Seca, L., Costa, H., Moreira, C.L., Peças Lopes, J.A.: ‘An innovative strategy for power system restoration using utility scale wind parks’. Proc. IX (IREP), 2013, pp. 18.
    3. 3)
    4. 4)
    5. 5)
    6. 6)
      • 6. Liang, H., Gu, X., Zhao, D.: ‘Optimization of system partitioning schemes for power system black-start restoration based on genetic algorithms’. Proc. APPEEC, 2010, pp. 14.
    7. 7)
      • 7. Tortós, J.Q., Terzija, V.: ‘A smart power system restoration based on the merger of two different strategies’. Proc. ISGT Europe, 2012, pp. 18.
    8. 8)
      • 8. Zhong, H., Gu, X., Zhu, X.: ‘Optimization method for unit restarting during power system black-start restoration’. Proc. APPEEC, 2012, pp. 14.
    9. 9)
      • 9. Final Report of Power Systems Engineering Research Center (PSERC) Project S30, Development and Evaluation of System Restoration Strategies from a Blackout, 2009.
    10. 10)
      • 10. Sun, W., Liu, C.C., Chu, R.F.: ‘Optimal generator start-up strategy for power system restoration’. Proc. 15th Int. Conf. Intelligent System Applications to Power Systems, 2009, pp. 17.
    11. 11)
      • 11. Lu, E., Wang, N., Qin, Z., Liu, H., Hou, Y.: ‘Black-start strategy for power grids including fast cut thermal power units’. Proc. IEEE Power and Energy Society General Meeting, 2013, pp. 15.
    12. 12)
      • 12. Sun, W., Liu, C.C.: ‘Optimal transmission path search in power system restoration’. Proc. IX (IREP) Symp.-Bulk Power System Dynamics and Control, 2013, pp. 15.
    13. 13)
      • 13. Liu, C., Wu, M., Deng, Y.: ‘Start-up sequence of generators in power system restoration avoiding the backtracking algorithm’. Proc. IEEE Power and Energy Society General Meeting, 2013, pp. 15.
    14. 14)
    15. 15)
      • 15. El-Zonkoly, A., Desouki, H., Farghaly, A.: ‘Firefly based approach for optimal power system black-start restoration’. Proc. EPE, 2014, pp. 1116.
    16. 16)
      • 16. Dimitrijevic, S., Rajakovic, N.: ‘Load reallocation in the service restoration application for distribution networks’. Proc. ISGT, 2014, pp. 15.
    17. 17)
      • 17. Castillo, A.: ‘Microgrid provision of blackstart in disaster recovery for power system restoration’. Proc. Smart Grid Communications (SmartGridComm), 2013, pp. 16.
    18. 18)
    19. 19)
    20. 20)
    21. 21)
    22. 22)
      • 22. Ketabi, A., Asmar, H., Ranjabar, A.M., Feuillet, R.: ‘An approach for optimal units start-up during bulk power system restoration’. Proc. LESCOPE ’01, 2001, pp. 190194.
    23. 23)
      • 23. Liu, Q., Ni, Y., Zhou, M., Li, G., Ni, Y.: ‘A new solution to generators start-up sequence during power system restoration’. Proc. the third Int. Conf. on Electric Utility Deregulation and Restructuring and Power Technologies, 2008, pp. 28452849.
    24. 24)
      • 24. Ketabi, A., Feuillet, R.: ‘Ant colony search algorithm for optimal generators startup during power system restoration’. Mathematical Problems in Engineering, 2010, pp. 111.
    25. 25)
      • 25. Yang, X.S.: ‘Firefly algorithms for multimodal optimization’. Stochastic Algorithms: Foundations and Applications, SAGA, 2009, (LNCS, 5792), pp. 169178.
    26. 26)
    27. 27)
      • 27. Grainger, J., Stevenson, W.Jr.: ‘Power system analysis’ (McGraw-Hill, 1994).
    28. 28)
      • 28. Egypt Travel Weather Averages (Weatherbase). [Online]. Available at http://www.weatherbase.com.
    29. 29)
      • 29. NASA's Surface Solar Energy Data Set. [Online]. Available at http://www.eosweb.larc.nasa.gov/sse/.
    30. 30)
      • 30. General Electric Company data sheets. [Online]. Available at http://www.ge-energy.com.
    31. 31)
      • 31. Solar Panel Guide. [Online]. Available at http://www.ata.org/wp-content/renew/.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2014.0646
Loading

Related content

content/journals/10.1049/iet-gtd.2014.0646
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address