access icon free Probabilistic multi-objective generation and transmission expansion planning problem using normal boundary intersection

This study presents a model of coordinated generation and transmission expansion planning (TEP). The proposed model simultaneously minimises total cost, including planning and total fuel cost, environmental impact in terms of SO2 and NO x emission and fuel price risk while maximising the system reliability. Owing to intermittent behaviour of loads and fuel prices, the expansion planning problem should be analysed using probabilistic approaches instead of deterministic ones. Therefore, a new approach is proposed to solve the multi-objective probabilistic coordinated generation and TEP problem. The point estimate method is used to take into account the effect of uncertainty in fuel prices and system demand. The normal boundary intersection (NBI) method is used to obtain the Pareto-optimal solutions. Moreover, fuzzy decision-making process is employed to select one of the Pareto-optimal solutions as the most preferred solution. The proposed model is implemented on the modified Garver6-bus system to evaluate its efficiency. Finally, the results of the NBI method are compared with the classical weighted sum method. Additionally, the model is implemented on the IEEE 24-bus reliability test system, and the results are compared with the virtual database-supported non-dominated sorting genetic algorithm II (VDS-NSGA II) and NSGA II methods.

Inspec keywords: probability; environmental factors; power transmission planning; power transmission reliability; fuzzy set theory; silicon compounds; decision making; power generation reliability; power generation planning; nitrogen compounds; Pareto optimisation

Other keywords: total fuel cost; Pareto-optimal solutions; modified Garver6-bus system; probabilistic approaches; SO2; VDS-NSGA II method; NBI method; fuel price risk; NOx; fuzzy decision-making process; system reliability; environmental impact; weighted sum method; transmission expansion planning; probabilistic multiobjective coordinated generation planning; virtual database-supported nondominated sorting genetic algorithm II; TEP; NSGA II methods; IEEE 24-bus reliability test system; normal boundary intersection

Subjects: Optimisation techniques; Combinatorial mathematics; Other topics in statistics; Reliability; Power transmission, distribution and supply; Power system planning and layout

References

    1. 1)
    2. 2)
    3. 3)
      • 10. Rubinstein, R.Y.: ‘Simulation and the Monte Carlo method’ (Wiley, 1981).
    4. 4)
    5. 5)
    6. 6)
    7. 7)
    8. 8)
    9. 9)
    10. 10)
    11. 11)
    12. 12)
      • 5. Rudkevich, A.M.: ‘A nodal capacity market for co-optimization of generation and transmission expansion’. 2012 50th Annual Allerton Conf. Communication, Control, and Computing (Allerton), pp. 10801088.
    13. 13)
    14. 14)
    15. 15)
    16. 16)
      • 9. Tung, Y.K., Yen, B.C.: ‘Hydro systems engineering uncertainty analysis’ (McGraw-Hill, 2005).
    17. 17)
    18. 18)
      • 17. Conejo, A.J., Carrión, M., Morales, J.M.: ‘Decision making under uncertainty in electricity markets’ (Springer, 2010).
    19. 19)
      • 28. Javadi, M.S., Saniei, M., Rajabi-Mashhadi, H.: ‘An augmented NSGA-II technique with virtual database to solve the composite generation and transmission expansion planning problem’, J. Exp. Theo. Artif. Intell., 2013, 12, (1), pp. 124.
    20. 20)
      • 8. CIGRE TF 38.05.08: ‘Techniques for power system planning under uncertainties’. Technical Brochure Ref., 2000, 154.
    21. 21)
    22. 22)
    23. 23)
      • 27. http://www.GAMS.com.
    24. 24)
    25. 25)
    26. 26)
    27. 27)
    28. 28)
    29. 29)
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2014.0278
Loading

Related content

content/journals/10.1049/iet-gtd.2014.0278
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading