access icon free Investigation of synchronous generator in reactive power market – an accurate view

This study addresses clarification regarding total payment function calculation in reactive power market. One of the main sources of reactive power in transmission network is synchronous generator. Capability curves of reactive power produced by synchronous generators are surveyed in this study. Meanwhile, using these curves, all the costs of one synchronous generator to inject or absorb reactive power are calculated. These costs include an availability cost and cost of losses as well as cost of losing the sale opportunity of electrical energy because of production or absorption of reactive power. The IEEE 24-bus reliability test system is used to illustrate the proposed cost calculation technique in reactive power market.

Inspec keywords: reactive power; power transmission reliability; synchronous generators; power transmission economics; power markets

Other keywords: transmission network; capability curves; IEEE 24-bus reliability test system; total payment function calculation; cost calculation technique; reactive power market; reactive power absorption calculation; synchronous generator; reactive power injection calculation

Subjects: Reliability; Power system management, operation and economics; Synchronous machines; Power transmission, distribution and supply

References

    1. 1)
    2. 2)
    3. 3)
    4. 4)
    5. 5)
    6. 6)
    7. 7)
      • 2. FERC Order No. 888: ‘Promotion of wholesale competition through open access non-discriminatory transmission services by public utilities and recovery of stranded costs by public utilities and transmitting utilities’, 1996.
    8. 8)
    9. 9)
      • 10. Kundur, P.: ‘Power system stability and control’ (McGraw-Hill, New York, 1994).
    10. 10)
    11. 11)
    12. 12)
      • 19. Rabiee, A., Shayanfar, H.A., Amjady, N.: ‘A new framework for reactive power market considering power system security’, Iran. J. Electr. Electron. Eng., 2009, 5, (3), pp. 196204.
    13. 13)
    14. 14)
    15. 15)
    16. 16)
    17. 17)
    18. 18)
    19. 19)
    20. 20)
    21. 21)
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2013.0901
Loading

Related content

content/journals/10.1049/iet-gtd.2013.0901
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading