Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Evaluation and improvement of generators reactive power margins in interconnected power systems

Evaluation and improvement of generators reactive power margins in interconnected power systems

For access to this article, please select a purchase option:

Buy article PDF
£12.50
(plus tax if applicable)
Buy Knowledge Pack
10 articles for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
IET Generation, Transmission & Distribution — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

The amount of reactive power margin available in a system determines its proximity to voltage instability under normal and emergency conditions. More the reactive power margin, better is the systems security and vice-versa. A hypothetical way of improving the reactive margin of a synchronous generator is to reduce the real power generation within its mega volt-ampere (MVA) ratings. This real power generation reduction will affect its power contract agreements entered in the electricity market. Owing to this, the benefit that the generator foregoes will have to be compensated by paying them some lost opportunity cost. The objective of this study is three fold. Firstly, the reactive power margins of the generators are evaluated. Secondly, they are improved using a reactive power optimization technique and optimally placed unified power flow controllers. Thirdly, the reactive power capacity exchanges along the tie-lines are evaluated under base case and improved conditions. A detailed analysis of all the reactive power sources and sinks scattered throughout the network is carried out in the study. Studies are carried out on a real life, three zone, 72-bus equivalent Indian southern grid considering normal and contingency conditions with base case operating point and optimised results presented.

References

    1. 1)
    2. 2)
    3. 3)
    4. 4)
    5. 5)
      • Abed, A.M.: `WSCC voltage stability criteria, under-voltage, load shedding strategy, and reactive power reserve monitoring methodology', Proc. IEEE Power Engineering Society Summer Meeting, July 1999, Edmonton, AB, Canada, 1, p. 191–197.
    6. 6)
      • B. Kirby , E. Hirst . (1997) Ancillary service details: voltage control.
    7. 7)
    8. 8)
    9. 9)
    10. 10)
      • PJM Open Access Transmission Tariff: ‘PJM interconnection’, L.L.C, May 2002. Available at //www.pjm.com.
    11. 11)
    12. 12)
    13. 13)
    14. 14)
    15. 15)
      • New York Independent System Operator: ‘NYISO ancillary services manual’, 1999. Available at //www.nyiso.com.
    16. 16)
    17. 17)
    18. 18)
    19. 19)
    20. 20)
    21. 21)
    22. 22)
    23. 23)
    24. 24)
      • Independent System Operator-New England (ISO-NE). Available at http://www.iso-ne.com/.
    25. 25)
      • NERC: ‘US–Canada power system outage task force’. Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations, 5 April 2004. Available at //www.nerc.com/.
    26. 26)
      • NERC Planning Standards: ‘North American electric reliability council’. Available at //www.nerc.com.
    27. 27)
    28. 28)
    29. 29)
    30. 30)
    31. 31)
    32. 32)
      • Chicco, G., Gross, G.: `Current issues in reactive power management: a critical overview', IEEE Conf. on Reactive Power Management and Payment Mechanisms in Competitive Electricity Markets, 2008.
http://iet.metastore.ingenta.com/content/journals/10.1049/iet-gtd.2010.0553
Loading

Related content

content/journals/10.1049/iet-gtd.2010.0553
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address