Low PRF Operation

Access Full Text

Low PRF Operation

For access to this article, please select a purchase option:

Buy chapter PDF
£10.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
Introduction to Airborne Radar — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Author(s): George W. Stimson
Source: Introduction to Airborne Radar,1998
Publication date January 1998

At low PRF, mainlobe clutter may largely be eliminated by offsetting the Doppler spectrum so the central line is at dc and passing the return through a clutter canceller and bank of Doppler filters. To keep the clutter in the canceller's rejection notches, the 'offset' must be varied with radar speed and antenna look angle.

Chapter Contents:

  • Differentiating Between Targets and Clutter
  • Signal Processing
  • Less Sophisticated Signal Processing
  • Advantages and Limitations
  • Getting Around Limitations

Inspec keywords: echo suppression; radar clutter; radar antennas; Doppler radar

Other keywords: low PRF operation; canceller rejection notch; Doppler spectrum; radar speed; clutter canceller; Doppler filters; antenna look angle; mainlobe clutter

Subjects: Radar equipment, systems and applications; Electromagnetic compatibility and interference; Single antennas

Preview this chapter:
Zoom in
Zoomout

Low PRF Operation, Page 1 of 2

| /docserver/preview/fulltext/books/ra/sbra101e/SBRA101E_ch26-1.gif /docserver/preview/fulltext/books/ra/sbra101e/SBRA101E_ch26-2.gif

Related content

content/books/10.1049/sbra101e_ch26
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading