Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Traffic considerations in switching-system choice and dimensioning

Traffic considerations in switching-system choice and dimensioning

For access to this article, please select a purchase option:

Buy chapter PDF
£10.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
Telecommunications Traffic, Tariffs and Costs. An Introduction for Managers — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

A telecommunications switching centre is constructed from an integrated range of equipment modules collectively termed a switching system. The task of deciding which and how many of these modules are needed for a particular application is generally referred to as switching-centre dimensioning. The dimensioning process is, however, constrained by the pattern and extent of the breakdown into equipment modules in other words, by the overall conceptual design of the switching system itself. A switching system is designed for the cost-effective handling of one particular type of traffic; a system intended for telephone and other call-based traffic is significantly different from those for message or packet-based data traffic.

Inspec keywords: telecommunication traffic; telecommunication switching; packet switching

Other keywords: switching centre dimensioning; packet-based data traffic; call-based traffic; switching system; telecommunications switching centre; traffic considerations

Subjects: Switching centres and equipment

Preview this chapter:
Zoom in
Zoomout

Traffic considerations in switching-system choice and dimensioning, Page 1 of 2

| /docserver/preview/fulltext/books/te/pbte019e/PBTE019E_ch7-1.gif /docserver/preview/fulltext/books/te/pbte019e/PBTE019E_ch7-2.gif

Related content

content/books/10.1049/pbte019e_ch7
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address