Effect of reliability on offshore availability

Access Full Text

Effect of reliability on offshore availability

For access to this article, please select a purchase option:

Buy chapter PDF
£10.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
Offshore Wind Turbines: Reliability, availability and maintenance — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Author(s): Peter Tavner
Source: Offshore Wind Turbines: Reliability, availability and maintenance,2012
Publication date January 2012

The first large offshore wind farm in the world, consisting of 80 Vestas V80-2 MW WTs each of 5027 m2 swept area, was completed in 2002 in 6-14 m of water in the North Sea at Horns Rev, 14-20 km off the West Jutland coast of Denmark. The project was managed by the West Danish utility Elsam, now DONG Energy, and the wind farm is connected via an offshore substation using 30 kV AC collector cables and to shore from the substation via a 150 kV AC export cable. Maintenance of the wind farm was conceived on the basis of using helicopters access to individual WT nacelles via specially designed access platforms built onto the nacelles to accommodate drops and lifts from the Eurocopter EC135.

Chapter Contents:

  • 6.1 Early European offshore wind farm experience
  • 6.1.1 Horns Rev I wind farm, Denmark
  • 6.1.2 Round 1 wind farms, the United Kingdom
  • 6.1.3 Egmond aan Zee, Netherlands
  • 6.2 Experience gained
  • 6.2.1 General
  • 6.2.2 Environment
  • 6.2.3 Access
  • 6.2.4 Offshore LV, MV and HV networks
  • 6.2.4.1 Substation
  • 6.2.4.2 Collector cables
  • 6.2.4.3 Export cable connection
  • 6.2.5 Other Round 1 wind farms, the United Kingdom
  • 6.2.6 Commissioning
  • 6.2.7 Planning offshore operations
  • 6.3 Summary
  • 6.4 References

Inspec keywords: power system reliability; wind turbines; maintenance engineering; offshore installations; power cables

Other keywords: AC export cable; reliability; wind farm maintenance; offshore availability; voltage 150 kV; wind turbine; offshore wind farm; WT nacelles; helicopters; AC collector cables; Eurocopter EC135; offshore substation; voltage 30 kV

Subjects: Wind power plants; Reliability; Power cables

Preview this chapter:
Zoom in
Zoomout

Effect of reliability on offshore availability, Page 1 of 2

| /docserver/preview/fulltext/books/po/pbrn013e/PBRN013E_ch6-1.gif /docserver/preview/fulltext/books/po/pbrn013e/PBRN013E_ch6-2.gif

Related content

content/books/10.1049/pbrn013e_ch6
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading