Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Requirements definition and equipment nomenclature

Requirements definition and equipment nomenclature

For access to this article, please select a purchase option:

Buy chapter PDF
£10.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
Thermal Power Plant Control and Instrumentation: The control of boilers and HRSGs. — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

In this chapter we have considered some of the documentation systems that may be used to define and manage the wide range of requirements to be met by a C&I system. In the next two chapters we will delve into some of the processes used for designing modern boiler protection systems and the structures of advanced modulating and sequence controls employed to enhance the operational flexibility of power plant.

Chapter Contents:

  • 9.1 Overview
  • 9.2 Defining the requirements
  • 9.2.1 The Project Plan
  • 9.2.2 System descriptions
  • 9.2.3 The Functional Design Specification
  • 9.2.4 The Technical Specification
  • 9.2.5 Design of functional safety systems and related boiler control logic
  • 9.2.6 Testing requirements
  • 9.2.7 Making provision for site tests
  • 9.2.8 Vendor documentation systems
  • 9.3 The KKS equipment identification system
  • 9.3.1 The importance of agreement and coordination
  • 9.3.2 Review of KKS
  • 9.3.2.1 The levels of coding
  • 9.3.2.2 Explanation of the main coding principles
  • 9.3.3 An example of how the codes are used
  • 9.4 Summary
  • References

Inspec keywords: thermal power stations; power generation protection; boilers; power generation control

Other keywords: C&I system; boiler protection systems; power plant; equipment nomenclature; sequence controls; documentation systems; control and instrumentation system

Subjects: Control of heat systems; Thermal power stations and plants; Power system protection

Preview this chapter:
Zoom in
Zoomout

Requirements definition and equipment nomenclature, Page 1 of 2

| /docserver/preview/fulltext/books/po/pbpo119e/PBPO119E_ch9-1.gif /docserver/preview/fulltext/books/po/pbpo119e/PBPO119E_ch9-2.gif

Related content

content/books/10.1049/pbpo119e_ch9
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address