Requirements definition and equipment nomenclature
In this chapter we have considered some of the documentation systems that may be used to define and manage the wide range of requirements to be met by a C&I system. In the next two chapters we will delve into some of the processes used for designing modern boiler protection systems and the structures of advanced modulating and sequence controls employed to enhance the operational flexibility of power plant.
Preview this chapter:
Requirements definition and equipment nomenclature, Page 1 of 2
< Previous page Next page > /docserver/preview/fulltext/books/po/pbpo119e/PBPO119E_ch9-1.gif /docserver/preview/fulltext/books/po/pbpo119e/PBPO119E_ch9-2.gif