Your browser does not support JavaScript!
http://iet.metastore.ingenta.com
1887

Scheme investment procedure

Scheme investment procedure

For access to this article, please select a purchase option:

Buy chapter PDF
£10.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
High Voltage Power Network Construction — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

This chapter has examined the scheme investment procedure, which is the tier 1 and highest level (umbrella) document in a power network construction QMS suite of procedures. The objective of the procedure is to obtain an optimum design and cost effective solution that satisfies the need case. This in turn requires a relatively complex process that must take into account a very significant number of considerations. Those who lead, and have responsibilities within, this process must be well versed and competent in the requirements, since the decisions made have a profound impact on the integrity of the power system and the financial wellbeing of the companies involved.

Chapter Contents:

  • 17.1 Scheme procedures
  • 17.2 Construction QMS procedures — structure and subject-matter
  • 17.3 Scheme investment procedure
  • 17.3.1 The scheme investment procedure — application
  • 17.3.2 Scheme investment procedure — content
  • 17.3.3 Scheme team
  • 17.3.4 Scheme timescales
  • 17.3.5 Need case
  • 17.3.6 Optioneer
  • 17.3.7 Develop
  • 17.3.8 Need case, optioneer, develop — range of documentation
  • 17.3.9 Sanction
  • 17.3.10 Scheme review/closure
  • 17.4 Major infrastructure projects
  • 17.4.1 Major infrastructure projects — outline
  • 17.4.2 Scheme alignment with the planning act 2008
  • 17.4.3 Holford and Horlock Rules
  • 17.5 Scheme investment procedure — complexity

Inspec keywords: power system management; quality management

Other keywords: scheme investment procedure; power system integrity; power network construction QMS suite of procedures

Subjects: Power system management, operation and economics

Preview this chapter:
Zoom in
Zoomout

Scheme investment procedure, Page 1 of 2

| /docserver/preview/fulltext/books/po/pbpo110e/PBPO110E_ch17-1.gif /docserver/preview/fulltext/books/po/pbpo110e/PBPO110E_ch17-2.gif

Related content

content/books/10.1049/pbpo110e_ch17
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading
This is a required field
Please enter a valid email address