Detail design, manufacture and site installation

Detail design, manufacture and site installation

For access to this article, please select a purchase option:

Buy chapter PDF
(plus tax if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend to library

You must fill out fields marked with: *

Librarian details
Your details
Why are you recommending this title?
Select reason:
High Voltage Power Network Construction — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

The three project stages of detail design, manufacture (including procurement) and site installation are primarily in the domain of the contractor. The earlier stages of detail design and manufacture are concerned with the detailed engineering requirements of the project in which every nut, bolt and wire, etc., is identified. In contrast, the later stage of site installation is concerned with the erection of the manufactured equipment (and construction of the associated site infrastructure) - in accordance with the requirements of the detail design (i.e. drawings and schedules). This chapter will examine the technical considerations and requirements relating to these three key stages.

Chapter Contents:

  • 14.1 Introduction
  • 14.2 Detail design
  • 14.2.1 Detail design — overview
  • 14.2.2 Substation HV equipment
  • 14.2.3 Protection and control
  • 14.2.4 Civil, structural and building engineering
  • 14.2.5 OHL
  • 14.2.6 HV cables
  • 14.3 Manufacture/procure
  • 14.3.1 Manufacture/procure specification
  • 14.3.2 Manufacturing surveillance
  • 14.3.3 Manufacture/procure — detail design interface
  • 14.4 Site installation
  • 14.4.1 Site installation — overview
  • 14.4.2 Site installation — content
  • 14.4.3 Site establishment
  • 14.4.4 Demolition/removal
  • 14.4.5 Excavation
  • 14.4.6 Piling operations
  • 14.4.7 Lifting operations
  • 14.4.8 Erection of structures
  • 14.4.9 Scaffolding
  • 14.4.10 Electricity on site
  • 14.4.11 Impressed voltages
  • 14.4.12 Road works
  • 14.4.13 Dangers arising from OHL and underground services
  • 14.4.14 Contaminated sites
  • 14.4.15 OHL considerations
  • 14.4.16 HV cable considerations
  • 14.4.17 Site installation — completion checks

Inspec keywords: electrical installation; design engineering

Other keywords: detailed engineering requirements; manufacture stage; site installation stage; detail design stage; contractor

Subjects: Project and design engineering; Electrical contracting and installation

Preview this chapter:
Zoom in

Detail design, manufacture and site installation, Page 1 of 2

| /docserver/preview/fulltext/books/po/pbpo110e/PBPO110E_ch14-1.gif /docserver/preview/fulltext/books/po/pbpo110e/PBPO110E_ch14-2.gif

Related content

This is a required field
Please enter a valid email address