Partial discharge measuring technique

Access Full Text

Partial discharge measuring technique

For access to this article, please select a purchase option:

Buy chapter PDF
£10.00
(plus tax if applicable)
Buy Knowledge Pack
10 chapters for £75.00
(plus taxes if applicable)

IET members benefit from discounts to all IET publications and free access to E&T Magazine. If you are an IET member, log in to your account and the discounts will automatically be applied.

Learn more about IET membership 

Recommend Title Publication to library

You must fill out fields marked with: *

Librarian details
Name:*
Email:*
Your details
Name:*
Email:*
Department:*
Why are you recommending this title?
Select reason:
 
 
 
 
 
High Voltage Engineering Testing — Recommend this title to your library

Thank you

Your recommendation has been sent to your librarian.

Author(s): Ernst Gockenbach 1
View affiliations
Source: High Voltage Engineering Testing,2013
Publication date September 2013

The partial discharge measurement is a typical non-destructive test and it can be used to judge the insulation performance at the beginning of its service time taking into account the reduction of the performance during the service time by the ageing whereby the ageing depends on numerous parameters like electrical stress, thermal stress and mechanical stress. Depending on the kind of insulating material different limits for the allowed partial discharge value at a given stress are defined in the relevant recommendations. In particular for solid insulation where a complete breakdown damages seriously the test object the partial discharge measurement is a tool for the quality assessment.

Chapter Contents:

  • 17.1 Introduction
  • 17.2 Physical background of partial discharges
  • 17.3 Requirements on a partial discharge measuring system
  • 17.4 Measuring systems for apparent charge
  • 17.5 Calibration of a partial discharge measuring system
  • 17.6 Examples of partial discharge measurements
  • 17.6.1 Partial discharge measurement on high-voltage transformers
  • 17.6.2 Partial discharge measurement and location on high-voltage cables
  • 17.6.3 Partial discharge measurement on high-voltage gas-insulated substations
  • 17.6.4 Development of recommendation
  • 17.7 Summary
  • References

Inspec keywords: insulating materials; partial discharge measurement; nondestructive testing

Other keywords: insulating material; service time; mechanical stress; ageing; thermal stress; partial discharge measurement; insulation performance; electrical stress; nondestructive test

Subjects: Charge measurement; Insulation and insulating coatings; Materials testing

Preview this chapter:
Zoom in
Zoomout

Partial discharge measuring technique, Page 1 of 2

| /docserver/preview/fulltext/books/po/pbpo066e/PBPO066E_ch17-1.gif /docserver/preview/fulltext/books/po/pbpo066e/PBPO066E_ch17-2.gif

Related content

content/books/10.1049/pbpo066e_ch17
pub_keyword,iet_inspecKeyword,pub_concept
6
6
Loading